Similar Projects
Campus Plumbing Maintenance and Repair Services
Bidding
Normal, AL 35762

Plumbing Services Various City of Mobile Facilities
Term Contract
Bidding
Mobile, AL

V.A.W. Water System
Renovation
Post-Bid
Vinemont, AL 35179

Plumbing Services
Term Contract
Post-Bid
AL

Z--#521-16-101 Replace Pressure Piping and Hot Water Distribution System
Results
$5,000,000 to $10,000,000 est. value
Birmingham, AL 35233

UAB CPM Plumbing Riser Replacement
Results
Birmingham, AL

Yearly Labor Contract Plumbing
Post-Bid
Tuscaloosa, AL

Oak Mountain High School Plumbing & HVAC Systems Renovations
Results
Columbiana, AL

Plumbing Fixtures
Term Contract
Post-Bid
Huntsville, AL

Plumbing Repair and Maintenance Service
Term Contract
Results
Decatur, AL 35602

Buckhorn Culinary Classroom Mechanical, Electrical and Plumbing Project
Term Contract
Post-Bid
New Market, AL 35761

RAS Valve Replacement Project
Results
Less than $50,000 est. value
Tuscaloosa, AL

Tricentennial Park - Lake Fountain Replacement
Post-Bid
Mobile, AL 36617

Pipe System
Results
Huntsville, AL

Plumbing Services
Post-Bid
Alabaster, AL

Last Updated 12/10/2018 01:23 PM
Project Title

Jefferson County Bessemer Jail Plumbing Piping Upgrade

Physical Address View project details and contacts
City, State (County) Bessemer, AL 25020   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description All sanitary waste piping, exposed and concealed in walls and above ceilings, serving the basement, first, and second floors of the facility shall be replaced. New waste piping shall be installed in the same location and connected to existing fixtures. Existing vent piping, as well as hot and cold pressure piping shall remain, however, various plumbing accessories will also be replaced. To facilitate replacement of sanitary waste piping various ceilings, and walls will be removed and replaced. Both gyp board and lay in ceilings will be affected as well as gyp board, and masonry walls. Finishes affected by the plumbing work will be redone, and masonry floors subject to wet conditions shall be re-coated. Electrical work shall include replacement of existing fluorescent lighting fixtures with LED fixtures. Existing ceiling mounted devices such as smoke detectors, speakers, exit signs, and CCTV cameras shall be temporarily supported and reinstalled in conjunction with new ceiling installations. The project shall be constructed in five phases to allow the shutdown and replacement of waste piping vertically.
Details
Division 22 - Plumbing, Common Work Results for Plumbing.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents