Similar Projects
Dike & Revetment - USACE St. Louis District
Design
$15,000,000 est. value
Cairo, IL

Chicago Harbor Lock Chamber Floor and Wall Repair
Renovation
Design
$25,000,000 to $100,000,000 est. value
Chicago, IL

Structural & Non-Structural Tunnel & Bridge Repair
Renovation
Bidding
Chicago, IL 60629

Maintenance, and Repair Services for the Chicago Tunnel Systems and Pump Stations
Renovation
Bidding
Chicago, IL

Mel Price Lift Gate Replacement
Post-Bid
Alton, IL

Mel Price Main Lock Overlook Alterations
Renovation
Post-Bid
Alton, IL 62002

Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

Chicago Harbor Lock Power Distribution Upgrades
Renovation
Design
$250,000 to $500,000 est. value
Chicago, IL 60604

Illinois River Basin; Brandon Road Lock, Will County, Il, Upper Bulkhead Recesses
Renovation
Post-Bid
$10,000,000 est. value
IL

Crab Orchard NWR Devils Kitchen Dam Aux Splway
Results
$500,000 to $1,000,000 est. value
Marion, IL

MPLD Main Lock Overlook Alterations
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
East Alton, IL

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Results
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Market Survey_Olmsted Dam Maintenance Support Contract
Renovation
Post-Bid
$8,200,000 est. value
Olmsted, IL 62970

Peoria and LaGrange Dams Composite Wicket Gates
Results
Peoria, IL

Last Updated 03/02/2022 02:21 AM
Project Title

Drop Shaft Modifications and Collection Facilities

Physical Address View project details and contacts
City, State (County) Des Plaines, IL 60016   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,512,500 to $5,462,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate 100 feet of 108 IN circular sewer by cured-in-place pipe lining or geopolymer, rehabilitate 75 LF of 9 LF diameter Drop Shaft No. 5 by form and pour lining or slip lining, rehabilitation of existing conduit at Drop Shaft No. 5, replace 3 sluice gates, replace drain outlets in Drop Shaft No. 5, install louver systems, modify existing structures, replace deteriorated metal appurtenances, perform inspection of a tunnel, install a suppression weir near Drop Shaft 1/1A and perform modifications to the sluice grate structures near DS N19

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents