Similar Projects
Electrical Equipment Upgrade - C26097 - Cuyahoga County
Renovation
Conception
$1,492,597 est. value
Cleveland, OH 44115

Pump Station Construction
New Construction
Design
$1,500,000 est. value
Middletown, OH

Greenbriar Lift Station Improvements
Renovation
Bidding
$1,400,000 est. value
Batavia, OH 45103

Richfield Pump Station
Renovation
Bidding
$500,000 est. value
Ashley, OH

Influent Lift Station Screen Improvements
Renovation
Post-Bid
Milford, OH

Sewer Modernization and Revitalized Treatment (Smart) Project
New Construction
Post-Bid
OH

Blue Fountain Lift Station Pump Replacement
Results
Gallipolis, OH 45631

Pump Station Replacement for Mumaugh Road and Cable Road
Results
Lima, OH

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Watkins Road Pump Station
Infrastructure
Bidding
$6,750,000 CJ est. value
Marysville, OH 43040

Sanitary Lift Station Rehabilitation
Renovation
Post-Bid
$245,000 est. value
Ansonia, OH

7th Street Sanitary Sewer Pump Station and Forcemain Project
Results
Waverly, OH

Industrial Corridor Pump Station and Force Main
New Construction
Construction
Ironton, OH 45638

Preventative Maintenance of the Wyandotte Woods Sanitary Sewer Pump Station Plus 13 Lift Stations (3- Year agreement)
Term Contract
Post-Bid
Dublin, OH

Last Updated 07/21/2022 06:58 AM
Project Title

Bay View Knife Gate Rebuild

Physical Address View project details and contacts
City, State (County) Toledo, OH 43611   (Lucas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To remove, rebuild, and reinstall a 36-inch bonneted knife gate valve at the Bay View Pump Station, 3900 North Summit St., Toledo Oh. a. The City of Toledo will secure, lock-out, b. The Contractor will remove the Rotork actuator from the valve. c. The Contractor, in coordination with The City, will shut down and isolate necessary pumps to remove the Knife gate. d. After the valve is removed, the contractor will blind flange both ends of the exposed piping so the pumps can be put back in service. e. The contractor will transport the valve to an appropriate shop for evaluation. f. After the shop evaluation, the contractor will submit a report to the City outlining all recommendations for replacement/refurbishment. g. The City will evaluate the report and approve the valve replacement/refurbishment work. (This work will be paid on a Time and Material basis) h. The Contractor, in coordination with The City, will shut down and isolate necessary pumps to replace the refurbished Knife gate. i. The Contractor will reinstall the actuator, restore power, and put the valve back inservice

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping, Bulk Materials Valves, Knife and Slide Gate Bulk Materials Valves.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents