Similar Projects
Savannah Special Operations Unit Station No 3
New Construction - 7,000 SF
Results
Pooler, GA

Intuitive Surgical - Ion Training Center TI
Renovation - 2,500 SF
Construction
$3,500,000 est. value
Peachtree Corners, GA 30092

Forensic Laboratory at Gillem Enclave, GA
Design
$25,000,000 to $100,000,000 est. value
Atlanta, GA 30303

East Georgia Regional Medical Center - CHS
Renovation - 2,400 SF
Construction
$1,482,817 est. value
Statesboro, GA

Program Management Services - Ag Facilities Enhancement
New Construction, Renovation - 50,215 SF
Results
Less than $190,000 est. value
Tifton, GA 31793

Atwood Chemistry Center 5th Floor Lab Renovation
Renovation - 2,822 SF
Construction
Emory University, GA 30322

Natural Science Center Lab 360 BSL -3 Renovation
Renovation - 1,800 SF
Results
Less than $1,543,000 est. value
Atlanta, GA 30303

BPC Plasma
Renovation - 20,729 SF
Post-Bid
Statesboro, GA

Technology Enterprise Park - Mixed Use
New Construction, Renovation
Pending Verification
Atlanta, GA

Solvay AD Solutions Lab
Renovation - 2,040 SF
Post-Bid
Alpharetta, GA 30005

New Engineering Multi-Use Lab
Renovation
Bidding
Dalton, GA 30721

Last Updated 02/15/2021 11:44 AM
Project Title

High-Containment Continuity Laboratory, Building 28 (HCCL, B-28) - CDC Roybal Campus, Atlanta, GA

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30329   (DeKalb County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Pre-Solicitation includes full and complete Construction Manager as Contractor (CMc) Pre-Construction, Construction and related project provisions. The CMc shall manage and perform the construction of the facility. The CMc shall provide: constructibility reviews of the design documents, cost estimates, participation in an independent value engineering process, management and inspection services, bonds, CPM schedules, health and safety plan, product submittal review, develop required coordination drawings, construction administration services, security and logistic control, furnish tools, materials, equipment, labor and incidentals, safety review/inspections, quality control, coordinate all construction related work, test and inspections, commissioning, operational manuals, facilities maintenance training, record documents, warranties, and other related professional services. The Government will utilize the services of an A/E for the project design and design side construction administration services. The CMc will be required to work with the A/E firm at the pre-design phase through project completion and will agree to accept the relationship of trust and confidence, and covenants with the Government, to furnish the requisite skill and judgements and to cooperate with the A/E in furthering the interests of the Government. The HCCL will be a highly flexible biological laboratory comprised of BSL-3E and BSL-4 laboratories and associated support. The multi-story research building will house adequate laboratory space for eighty laboratorians. The HCCL will have gross building area of approximately 100,000 square feet.

Details

1 Laboratory, Approximately 100,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents