Similar Projects
General Contractor Lewiston High School Comprehensive Expansion Project
Renovation, Addition - 41,500 SF
Results
Less than $9,500,000 est. value
Lewiston, ME 04240

Sale and Redevelopment of the Prior Martel School Building and Property at 860 Lisbon Street
Post-Bid
Lewiston, ME

MSAD 52 Leeds Central School Renovation
Renovation
Results
Leeds, ME 04263

Edward Little High School Project - Filed Sub Bids
New Construction
Results
$99,500,000 est. value
Auburn, ME 04210

John F Murphy Private School
New Construction - 41,400 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Lewiston, ME 04240

Lewiston Public Library Roof Restoration Project
Results
Lewiston, ME 04240

Addition and Renovations to Franklin School
Renovation, Addition
Results
Auburn, ME 04210

Roof Replacement
Results
Wales, ME 04280

Renovations to Auburn Middle School
Renovation
Results
Auburn, ME 04210

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Boys and Girls Club Roof Replacement Project
Results
Auburn, ME

Edward Little High School Project
New Construction - 280,000 SF
Results
Less than $99,500,000 est. value
Auburn, ME

Roofing MACC
Post-Bid

Roof Replacement at Barker Mill Arms
Post-Bid
Auburn, ME 04210

Roofing Repair and Maintenance
Post-Bid

Last Updated 06/03/2021 12:15 PM
Project Title

Fairview School Bathroom Renovations and Washburn School Re-Roof Project

Physical Address View project details and contacts
City, State (County) Auburn, ME   (Androscoggin County)
Category(s) Education, Single Trades
Sub-Category(s) Middle/Senior High School, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes removal of existing bathroom walls, door, ceiling and floor finishes, accessories, bathroom fixtures, and providing new shower stall, bathroom finishes and fixtures. Washburn School: Project consists of the installation of a new coverboard and EPDM roof system over the existing roof membrane including related work.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents