Similar Projects
Replacement of Existing Gas Boilers - General Bid
Bidding
Less than $180,000 est. value
North Andover, MA 01845

Page Hilltop School Boiler and UV Replacement - General Bids
Bidding
Ayer, MA 01432

Replacement of Existing Gas Boilers - Sub-Bid
Sub-Bidding
Less than $180,000 est. value
North Andover, MA 01845

Page Hilltop School Boiler and UV Replacement - Filed Sub Bids
Sub-Bidding
Ayer, MA 01432

Boiler, Chiller and Related Equipment Replacement - General Bids
Post-Bid
Less than $4,000,000 est. value
Springfield, MA 01103

Construction Manager at Risk Services for the Expanded Capacity
Post-Bid
Less than $15,000,000 est. value
Boston, MA

Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
Results
Boston, MA 02203

Somerville City Hall Boiler Renovation - General Bids
Term Contract
Results
Less than $668,377 est. value
Somerville, MA 02143

Monson Steam and Condensate Pipe Immediate Repairs
Bidding
$490,200 est. value
Monson, MA

Boilers Annual Preventative Maintenance, Service Calls, Parts And Components
Post-Bid
Boston, MA

Somerville City Hall Boiler Renovation - Filed Sub Bids
Term Contract
Results
Less than $668,377 est. value
Somerville, MA 02143

Water Heater Replacement, Kennedy Terrace 667-1 and King Terrace 667-2
Bidding
$86,000 est. value
Millis, MA

Boilers Annual Preventative Maintenance Contract
Term Contract
Post-Bid
Boston, MA

Boiler Repairs - Barnes Building - 495 Summer Street, Boston, MA 02210
Results
Boston, MA 02210

Heating Boiler Replacement Ghosh Science and Technology Center
Bidding
Worcester, MA 01602

Last Updated 11/11/2019 03:15 PM
Project Title

Z--Cooling System

Physical Address View project details and contacts
City, State (County) Turners Falls, MA 01376   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the engineering, design and construction of an effective method to stabilize temperatures in the Wet Lab to within an acceptable range. The ideal target temperatures are 72-78 degrees Fahrenheit at ground level with 50-60% relative humidity. The humidity levels will be maintained even when cooling is not otherwise required using a mechanical process. The new system will be integrated into the ALC-BAS.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Cooling Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents