Similar Projects
Water Main Improvements, Birch Road, Fairview Street and Farmington Avenue
Infrastructure
Bidding
$1,020,000 est. value
Longmeadow, MA 01106

2022 Crack Sealing
Infrastructure
Bidding
Springfield, MA

Furnishing and Delivery of Stainless Steel Pipes and Fittings
Post-Bid
Westfield, MA

Water Infrastructure Improvements
Post-Bid
$1,560,000 est. value
Springfield, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Intersection Improvements and Related Work (Including Signals) Along A Section of Berkshire Avenue at Cottage and Harvey Streets
Results
Less than $2,300,128 est. value
Springfield, MA 01101

Lathrop Street Water Main Replacement
Infrastructure
Bidding
West Springfield, MA 01089

Ductile Iron Pipe of Various Diameter
Post-Bid
Agawam, MA

Riverside Drive and Associated Infrastructure
Results
Less than $6,050,000 est. value
Ludlow, MA

Preservation of Roads, Driveways and Parking Lots
Infrastructure
Bidding
$635,000 est. value
Agawam, MA

Liquid Asphalt and Crack Sealing
Infrastructure
Post-Bid
Palmer, MA

Roadway Reconstruction and Related Work (Including Bridge Repairs, Highway Lighting and Signals) Along A Section of Burnett Road and Interstates 90 and 291 Ramps at Interchange 6
Results
Less than $8,260,648 est. value
Chicopee, MA 01013

Roadway Crack Sealing Services
Infrastructure
Bidding
West Springfield, MA

Paving Services for Glickman Elementary School
Infrastructure
Post-Bid
Less than $100,000 est. value
Springfield, MA 01119

Scheduled and Emergency HMA Pavement and Paved Waterway Repairs at Various Locations
Results
Less than $180,000 est. value

Last Updated 03/23/2022 09:38 AM
Project Title

2022 Chapin Street Water Main and Paving Improvements

Physical Address View project details and contacts
City, State (County) West Springfield, MA 01089   (Hampden County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install. 500 lineal feet of new six inch (6”) diameter ductile iron drinking water main, two new gate valves and one fire hydrant (hydrant shall be supplied by Dpw at 135 Piper Road). The main and services will be installed at a minimum depth of five (5’) feet. Work includes a connection to the existing main at a point approximately 60 feet into Chapin Street; transferring over 13 services (12 homes and one apartment building) from the existing main and the new hydrant, and a 3” depth temporary pavement patch. Paving can be completed at the end of the project in one mobilization but the contractor must adequately maintain the exposed gravel trenches for smoothness and dust. Groundwater is not expected to be an issue based on Dpw’s experience. If dewatering is required it will be paid for on a time and materials basis. All Chapin Street properties have Town sanitary sewer and drinking water services. Once the temporary water main by pass system is functioning the new water main will be installed in the same location as the existing 500 feet of 4” water main, thus requiring the contractor to remove and dispose of the existing ductile iron water main. About 110 feet of water main shall be abandoned in place at the dead end of Chapin Street. Phase Two Work Summary Work area is from Main Street easterly gutter line to the dead end. Work includes full depth reclaiming, grading, and hot mix asphalt with no puddles. Removal of the cape-cod berm, full depth pavement reclamation, sidewalk patch work, two inches of 19.0 intermediate (binder) course hot mix, tack coat, cape cod berm, and 9.5 top course.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents