Similar Projects
Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

Intersection of IL-17 and IL-1
Infrastructure
Bidding
$500,000 CJ est. value
Momence, IL 60954

Intersection of IL-17 and IL-1
Infrastructure
Bidding
$500,000 CJ est. value
Momence, IL 60954

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
Kankakee, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

Roadway and Drainage Improvements
Renovation, Infrastructure
Results
$95,227 est. value
Bourbonnais, IL 60914

Chick-Fil-A / Bradley
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Bourbonnais, IL 60914

Construction of a Storage Building
New Construction, Infrastructure
Design
Bourbonnais, IL 60914

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Road Improvements
Infrastructure
Results
$183,555 est. value
Pembroke Township, IL

HMA Maintenance Overlay
Infrastructure
Post-Bid
$1,107,000 est. value
Manteno, IL

Bituminous Materials
Infrastructure
Results
$476,148 est. value
Kankakee, IL

Asphalt Repair Services - Shapiro
Alteration
Post-Bid
$300,000 est. value
Kankakee, IL 60901

Last Updated 05/23/2023 07:38 AM
Project Title

Hot Mix Asphalt Surface Removal

Physical Address View project details and contacts
City, State (County) Bradley, IL 60915   (Kankakee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County Bradley Hot Mix Asphalt Surface Removal - (32,779 Sq Yd) Bituminous Materials (Prime Coat) (25 Ton) Hot Mix Asphalt Surface Course - Mix D, N50 ( 5513 Ton) Crack Sealing (3000 Ft) Modified Urethane Pavement Markings: 6" Line - 2230 Foot; 24" Line - 32 Foot, L&s 14 Sq Ft Class D Patching, Class D Patching, 4 Inch (1540 Sy) Patching Complete (4036 Sy) Project Location: Various Village Streets - (Location Map in Bid Packet) Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT -Hot Mix Asphalt Surface Removal-23-00000-00-GM

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents