Similar Projects
Walnut Street /Chestnut Street /Central Street Oval Improvements - City of Nashua
Infrastructure
Conception
$501,422 est. value
Nashua, NH

East Hollis Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH 03060

Statewide Central Guardrail
Infrastructure
Bidding
$875,051 est. value

Acquisition and Development of Pearl Street Parking Lot
Infrastructure
Post-Bid
Manchester, NH 03104

Acquisition and Development of Hartnett Parking Lot
Infrastructure
Post-Bid
Manchester, NH

Removal and Replacement of 3 Dynamic Message Signs at Locations ono NH 101 and the Spaulding TPK
Results
Less than $462,662 est. value

White Thermo Plastic PM Pavement Marking Material
Results
Concord, NH

Factory Street Sidewalks ADA Parking & Drainage (Water Street to Main Street)
Infrastructure
Conception
$450,000 est. value
Nashua, NH 03060

Pavement Lines and Markings
Infrastructure
Post-Bid
Nashua, NH

Maintenance of Select Stenciled and Transverse Line Pavement Markings
Results
$253,841 est. value

Boundary Monument Location Marking-Joppa Hill Farm
Infrastructure
Post-Bid
Bedford, NH

Athletic Field Striping
Results
Merrimack, NH

25 Foot Sections W-Beam Guardrail
Infrastructure
Post-Bid
Manchester, NH 03104

Parking Lot Striping
Infrastructure
Results

Removal of the Exit 10 NB Off and SB on Ramp Tolls Off the F.E. Everett Turnpike
Infrastructure
Post-Bid
Merrimack, NH

Reported 06/17/2022 10:16 AM
Project Title

Ledge Street at Nashua Canal Sidewalk and Guardrail - City of Nashua

Physical Address View project details and contacts
City, State (County) Nashua, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Nashua, New Hampshire. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway. Along Ledge Street between Stevens Ave. and Patten Ct., a chain link fence is the only protection between traveling vehicles and the canal. This request is to replace the existing chain link fence with a crash rated barrier to improve vehicle safety while maintaining proper pedestrian access. On October 11, 2009, a vehicle crashed into the fence and landed in the water of the canal highlighting the need for the improvements. As of June 16, 2022, this project is currently in the FY 2023-2028 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2023 and FY 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents