Similar Projects
Last Updated | 01/06/2020 09:17 AM |
Project Title | Fillmore Avenue Rehabilitation East Ferry Street to Glenny Drive |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, NY 14202 (Erie County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $686,887 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project includes the milling and resurfacing of Fillmore Avenue from East Ferry Street to Glenny Park, a distance of 0.72 miles within the City of Buffalo. The project also includes “spot” repairs to the existing concrete roadway base to correct deeper deterioration and “true and level” repairs to the existing asphalt courses to restore proper grade to the roadway. Additional work included in the project is the replacement of existing concrete sidewalk curb ramps with new ADA complaint curb ramps, new roadway striping including the addition of dedicated bike lanes, crosswalks and stop bars throughout the project limits, cleaning and minor rehabilitation of the street’s existing drainage structures, and replacement of traffic signal inductance loops with wireless detection systems at the project’s signalized intersections. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |