Similar Projects
Reported | 06/11/2019 12:00 AM |
Project Title | F--Mitigate Bird (Pigeon) Population |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32827 (Orange County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Bird mitigation services, including but not limited to, preventative maintenance, quarterly inspections, deterrent, trapping and cleanup. DETERRENT: Contractor shall install several Eagle Eye deterrents on the primary areas of activity. They shall target the corners of the surf board, the flanks on the Hospital/Clinic, Mental Health, IT wings, and each parking garage roof tops. Contract shall install thousands of Optical Gel pucks. These pucks will be installed to compliment the Eagle Eyes. They will be installed along the coping and corners where the birds are currently roosting. This includes much of the Surf Board, the 5th roof on the Hospital and Clinics, the parking garage and a few outlying corners where birds have begun to take roost TRAPPING SERVICE: Trapping shall be on a quarterly basis to prevent the birds from adapting to the methods being used. Each quarter will pre-bait for up-to 2 weeks at areas with Pigeon issues. Pre-Baiting will allow the birds to get comfortable with our trap placements. At which time, we will begin an active trap session for another 2 weeks and remove as many pigeons as possible in that timeframe. All traps will be covered and removed/replaced discreetly. During our quarterly service we will also inspect and service all Eagle-Eyes and Optical gels pucks. Replacing and repairing as needed. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |