Similar Projects
Aeronautics and Engineering Building Addition
Addition - 41,449 SF
Design
$19,000,000 est. value
Kent, Ravenna, OH 44242

University of Toledo - Bowman-Oddy Lab 0102
Renovation
Design
$120,000 est. value
Toledo, OH 43606

Ross Opr/Or Expansion
Renovation, Addition
Post-Bid
$9,692,655 est. value
Columbus, OH

Statewide Cabin Improvements - FY21-22
Renovation
Post-Bid
$6,200,000 CJ est. value
Columbus, OH 43215

Bryson Hall Interior Renovations
Renovation - 13,500 SF
Results
Less than $2,000,000 est. value
Marion, OH 43302

CSU - Berkman Hall/General Classroom Upgrade - Phase 2
Results
$3,600,000 est. value
Cleveland, OH 44114

Austin E Knowlton Science Center
New Construction - 32,500 SF
Construction
$10,000,000 est. value
Bluffton, OH 45817

WOSU Headquarters and Studios
New Construction, Build-Out - 115,000 SF
Construction
$32,000,000 est. value
Columbus, OH 43201

Hocking College HMN Mechum Building
Renovation
Design
$2,250,000 est. value
Nelsonville, OH 45764

Maintenance and Repair Contracting Pool Expansion - Athens Campus
Addition
Post-Bid
Athens, OH

Atwell - ADL Simulation Lab
Results
Less than $3,000,000 est. value
Columbus, OH

The Monument
New Construction, Demolition - 34,641 SF
Construction
$26,800,000 est. value
Dayton, OH 45402

Maintenance and Repair Contracting Pool Expansion - Regional Campuses
Addition
Post-Bid
Athens, OH

Stores & Rec - Room Upgrades
Renovation - 2,415 SF
Results
Less than $464,280 est. value
Columbus, OH

OWU Slocum Hall Renovation
Renovation - 29,000 SF
Construction
$9,000,000 est. value
Delaware, OH 43015

Last Updated 10/31/2022 07:04 AM
Project Title

Mansfield Civic Plaza Improvements

Physical Address View project details and contacts
City, State (County) Mansfield, OH 44906   (Richland County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $143,283 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Mansfield Civic Plaza Improvements 1. Current versions of the site, grading, drainage, utility, erosion control, and landscape plans; 2. electronic CAD file of the civil site plans listed in (1); 3. report of geotechnical investigation and all addenda and supplemental reports; 4. recommendations of the project Geotechnical Engineer regarding effective stress shear strength and total stress shear strength (when applicable) parameters for in-situ soils in the vicinity of the proposed retaining wall(s) and for any fill soil that may potentially be used as backfill in retained and/or foundation zones of the retaining wall. 5. Information pertaining to the magnitude, location, and nature of surcharge loadings acting on or near the proposed wall. The work shall consist of furnishing materials, labor, equipment, and supervisionfor the construction of a precast modular block (PMB) retaining wall structure in accordance with the requirements of this section and in acceptable conformity with the lines, grades, design, and dimensions shown in the project site plans. More Info: Associate contact: Megan Cyr,The Kleingers Group, (614)882-4311, megan.cyr@kleingers.com. OSU contacts: Technical- Jackie Yakubowski, yakubowski.1@osu.edu and Administrative- Holly Warner Administrator, warner.930@osu.edu. COVID-19 Vaccination Requirements Consistent with university guidelines and the recent federal action plan, all vendor employees, subcontractors and subconsultants identified as embedded within The Ohio State University are required to be fully vaccinated against COVID-19 by December 8, 2021. New vendors who become university vendors after the December 8, 2021 deadline will have 30 days to come into compliance. The Board of Trustees of The Ohio State University reserves the right to waive any informalities or to reject any or all bids. The EDGE Participation Goal for the Project is 5.0 percent. Est.cost- $178,000.00 Substantial Completion of all Work is 145 consecutive days All Questions should be submitted in writing. Deadline for bidding questions April 15, 2022, by 5:00 PM Bids will be publicly opened and read on April 22, 2022, at 2:00 PM. These bids will be submitted through Bid Express (HTTPS://Bidexpress.com). Please read the Instruction to Bidders within the Project Documents.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents