Similar Projects
WWTP Clear Well Improvements
Bidding
Less than $1,200,000 est. value
Ann Arbor, MI

Return Activated Sludge (RAS) Pump 3 Rebuild
Infrastructure
Bidding
Brighton, MI 48116

Test Well Number 8
Post-Bid
Flint, MI 48505

Vault Pumping Services for North Higgins Lake State Park and various locations administered by North Higgins Lake State Park
Post-Bid
Roscommon, MI

Hillview Wellhouse Improvements
Results
White Lake, MI

NGI Gate Replacement and Pump Addition
Results
Clinton Township, MI

Wet Well Vactoring
Infrastructure
Bidding
Brighton, MI

Water Park Pump Repairs
Post-Bid
MI

Chapaton Ps Dry Weather Pump and Screen Improvements
Results
Clinton Township, MI

Submersible Pumps
Term Contract
Bidding
MI

Well Tank Replacement Project for Lake Fenton Middle School
Post-Bid
Fenton, MI 48430

WTP Wash Water Pump and Piping Replacement
Results
Less than $1,100,000 est. value
Owosso, MI 48867

Stewart Ranch 1 Orphan Well
Infrastructure
Bidding
Walkerville, MI 49459

OTT Story Superfund Site Operable Unit #2 Groundwater Remedy - Phase I
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Muskegon, MI

Water Recycling Plant PVP Pump
Results
Alpena, MI 49707

Last Updated 05/27/2021 10:07 AM
Project Title

Water Well and Yard Hydrant Installation

Physical Address View project details and contacts
City, State (County) Rochester, MI 48306   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. A 5” Schedule 80 PVC well casing. 2. Well and pump capacity of 16 gallons per minute at 45 – 60 PSI. 3. Installation of water supply line and electrical wiring from well to pressure tank and pressure tank to electrical panel located inside the maintenance building. 4. Installation of a 20-gallon pressure tank inside heated maintenance building as shown in plans provided in this request for price. 5. Complete Installation of 2 – Woodford Model S4H sanitary yard hydrants as shown in plans provided in this request for price using at 1 inch or larger supply line. 6. Compacted sand backfill of any trenches crossing driveways or walking trails. 7. Installation of all exterior water lines and hydrants shall be below specified frost level for this region. 8. The contractor shall assume the responsibility of estimating the depth of the well. 9. The contractor must ensure that final inspections and water testing are satisfactory. 10. The contractor must submit to owner, all operating and maintenance instructions including shop drawings for all equipment installed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents