Similar Projects
Last Updated | 02/18/2020 12:15 PM |
Project Title | SR 31 Widening, Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Marysville, OH 43040 (Union County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,291,031 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the following: • Construct a new Ramp ‘E’ spur to connect S.R. 31 to U.S. 33 across from existing Ramp ’F’ – approximately 500 linear feet • Add an additional lane to existing Ramp ‘E’ – approximately 350 linear feet • Construct an extension of Northwoods Drive between S.R. 31 and Mill Road – approximately 725 linear feet • Convert a three leg intersection to a four leg intersection with the construction of a new round-a-bout • Extend Cobblestone Way to the proposed Northwoods Drive extension – approximately 350 linear feet • The widening of Ramp ‘E’ will require extending the existing culvert. • A new culvert will be needed for the new Ramp ‘E’ spur. • The project will include also curbing, storm sewer installation, striping, signage, street lighting, traffic signal replacement, sidewalks, shared use path, sanitary sewer, and water line installation. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |