Similar Projects
Volvo Auto Sales Development / Northampton
Renovation, Infrastructure
Design
$500,000 CJ est. value
Northampton, MA 01060

King Street Active Adult Living Facility
New Construction, Infrastructure - 110,000 SF
Design
$26,500,000 CJ est. value
Northampton, MA 01060

Bridge Replacement Bridge Number W-05-015 (Steel) Route 32 (Palmer Road) Over the Ware River
Demolition, New Construction, Infrastructure
Bidding
$8,964,302 CJ est. value
Ware, MA 01082

Campus Hardscape Repair and Excavation Service
Infrastructure
Post-Bid
$1,000,000 est. value
Amherst, MA

RFQ Construction Manager at Risk - Manning College of Information and Computer Sciences (CICS) Addition at UMass Amherst
Addition, Demolition, Infrastructure - 130,000 SF
Post-Bid
$94,000,000 CJ est. value
Amherst, MA 01002

Smith Academy Park Improvements Phase II Pavilion Project Re-Bid
Infrastructure
Results
$356,750 CJ est. value
Hatfield, MA 01038

Hallway Renovation, Phase I, Phins Hill Manor 667-1
Renovation
Results
$83,310 est. value
Granby, MA 01033

Hockanum Fence Replacement
Infrastructure
Construction
$87,500 CJ est. value
Hadley, MA 01035

Removal of Oil Tank at Amherst Regional Middle School
Infrastructure
Construction
$70,975 CJ est. value
Amherst, MA 01002

South Street Solar Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Granby, MA 01033

Conti Drive Commercial Development
New Construction, Infrastructure - 15,000 SF
Pending Verification
$3,960,000 CJ est. value
South Hadley, MA 01075

Senior Center Crawlspace Repairs and Renovations
Renovation, Infrastructure
Post-Bid
$100,000 CJ est. value
Middlefield, MA 01243

RA Bathroom Newton Unit 7
Renovation
Results
$18,720 est. value
South Hadley, MA 01075

New Fully ADA Compliant Ramp
Infrastructure
Post-Bid
$274,797 CJ est. value
Huntington, MA 01050

Campus- Hardscape Repair and Excavation Services
Infrastructure
Results
$1,000,000 est. value
Amherst, MA

Last Updated 09/28/2022 12:09 PM
Project Title

North Village Duct Bank

Physical Address View project details and contacts
City, State (County) Amherst, MA 01002   (Hampshire County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $510,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

North Village Duct Bank NOTE: Final Completion date based upon executed contract date is: September 9, 2022 Commonwealth of Massachusetts University of Massachusetts Sealed proposals submitted on a form furnished by the University of Massachusetts, and clearly identified as a Bid, endorsed with the name and address of the Bidder, the Project and Contract number will be received from: General Bidders Estimate: $510,000 project includes: Install ductbank for electrical service to new family housing. Minimum rates of wages to be paid on the project have been determined by the Commissioner of Labor & Workforce Development under the provisions of Sections 26 & 27, Chapter 149 of the General Laws. Wage rates are listed in the Contract form portion of specification book. Each General Bid proposal must be secured by an accompanying deposit of 5% of the total bid. Deposits shall be in the form of a BID BOND, CERTIFIED, TREASURER'S or CASHIER'S CHECK payable to the University of Massachusetts. Deposits shall be returned in accordance with the law. All bids for this project are subject to the provisions of either or both Massachusetts General Laws, Chapter 30, Section 39M as amended and Massachusetts General Laws, Chapter 149, Sections 44A 44I inclusive. The Awarding Authority reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Messenger and other type of pickup and delivery services are the agent of the bidder and the University assumes no responsibility for delivery or receipt of the documents. No personal checks or cash will be accepted as deposits. Refunds will be made to those returning the documents in satisfactory condition on or before 06/25/2022, otherwise the deposit shall be the property of the University. Question Submission Close Date 5/13/2022 2:00 PM EDT

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents