Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Henry Robinson Multi-Purpose Center HVAC Replacement
Alteration
Results
$650,000 est. value
Oakland, CA 94612

Harvest Park Middle School Gym Boilers Replacements
Alteration
Results
Pleasanton, CA 94566

HVAC Replacement
Term Contract
Post-Bid
$24,000 to $29,000 est. value
Alameda, CA

HVAC Repairs
Alteration
Results
Oakland, CA 94612

J041--VA Palo Alto Health Care System Chiller and Cooling Tower Maintenance Services
Term Contract
Post-Bid
Livermore, CA 94550

HVAC Repairs
Alteration
Results
CA

HVAC Lead Duct Revitalization
Term Contract
Post-Bid
CA

USCG Alameda Replace HVAC and Roofs
Infrastructure
Results
$500,000 to $1,000,000 est. value
Alameda, CA

California Highway Patrol (CHP) Oakland Area office - HVAC Maintenance Services
Term Contract
Post-Bid
Oakland, CA 94609

Relocate HVAC Ductwork and Furnish and Install Fire/Smoke Dampers (Alameda County)
Alteration
Results
$388,000 est. value
Oakland, CA 94612

California Highway Patrol (CHP) Mission Grade Commercial Vehicle Enforcement Facility (CVEF) - HVAC Maintenance Services.
Term Contract
Post-Bid
Sunol, CA 94586

O'Brien Hall HVAC Improvements
Alteration
Results
$160,000 est. value
Berkeley, CA

CHP Nimitz Commercial Vehicle Enforcement Facility (CVEF) and Nimitz Platform Scales - HVAC Maintenance Services.
Alteration
Post-Bid
Fremont, CA 94538

Reported 06/24/2022 12:00 AM
Project Title

Replace HVAC Building 54A, 42, 50 and 51

Physical Address View project details and contacts
City, State (County) Alameda, CA 94501   (Alameda County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, tools, equipment, transportation, field survey, verification, inspection, disposal, testing services, and supervision necessary to replace existing package air conditioning unit with new heat pump and replace existing split heating and air conditioning systems with new systems in Building 50 and 51 at Base Alameda. The work includes, but is not limited to, the following: A. Remove and dispose of (8) existing packaged heat pumps. Install (8) new packaged heat pumps with economizer at the location of removed heat pump. Connect heat pump to existing supply and return duct with new flex connections. B. Remove and dispose of (4) ductless split heating and air conditioning systems. Install (4) new ductless split system at the location of removed split systems. Insulate and support the new refrigerant pipe. C. Remove and dispose of (6) split heating and air condition systems with ducted fan coil. Install (6) split heating and air conditioning systems with ducted fan coil at the location of removed split systems. Insulate and support the new refrigerant pipe. Connect split system to existing supply and return duct with new flex connections and air filter housing. D. Provide new wired 7-day programmable thermostat and control wire to new HVAC equipment. All exposed control wire shall be in conduits. No wireless thermostat will be consider. E. Provide electrical power to the mechanical equipment. F. Open existing variable air volume (VAV) and by-pass dampers and remove VAV room thermostats. G. Provide and install mechanical equipment identification marker tags on new equipment installations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents