Similar Projects
Oklahoma Community College Hands Free Fixture Upgrade
Alteration
Post-Bid
Oklahoma City, OK 73159

Hot Tub Replacement
Alteration
Post-Bid
Oklahoma City, OK

Courthouse Water Fountain Project
Alteration
Results
Oklahoma City, OK 73102

Site and Building
Infrastructure, Alteration
Results
Norman, OK

Piping Repair and Replacement Services
Alteration
Post-Bid
Norman, OK

Plumbing and Gas Line Repair
Alteration
Results
$300,000 est. value
Oklahoma City, OK

Plumbing Repair and Maintenance Services for Interior and Exterior
Alteration
Post-Bid
$30,000 est. value
Oklahoma City, OK

Installation of Insertion Valves Ranging
Alteration
Results
$90,000 est. value
McAlester, OK

Plumbing Contractor 2022-2023
Alteration
Post-Bid
Muskogee, OK

Fiberglass Bulk Chemical Tank Repair at Mohawk Water Treatment Plant
Infrastructure
Results
$63,673 CJ est. value
Tulsa, OK 74115

CHIC 313113 - Pavement Improvements
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Sulphur, OK 73086

Automated Meter System (Electric and Water)
Renovation
Results
$2,098,284 CJ est. value
Blackwell, OK 74631

On Call Plumbing Repairs
Term Contract
Post-Bid
Oklahoma City, OK 73102

12-Inch Water Tower Line Replacement
Infrastructure
Results
$258,123 CJ est. value
Stratford, OK 74872

Cherokee County Livestock Arena - 22A - Building Plumbing
Alteration
Post-Bid
$50,000 est. value
Tahlequah, OK 74464

Last Updated 06/14/2023 12:05 PM
Project Title

Spot Repairs to N. Boggy Creek Storm Sewer Pipe on Elm Ave. From N. 3rd St. To N. Van Buren St

Physical Address View project details and contacts
City, State (County) Enid, OK 73701   (Garfield County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $323,750 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number:0000317220 Taylor Massey 580-616-7247 tmassey@enid.org - Insurance Required - Statutory :100 % The project is to repair compromised areas of the North Boggy Creek storm sewer pipe. The repairs will be in areas of the pipe that is on Elm Avenue from North 3rd Street to North Van Buren Street. Contact Information Angela Rasmuson 580-616-7242 arasmuson@enid.org Taylor Massey 580-616-7247 tmassey@enid.org Question Deadline May 01, 2023 at 5:00 PM The Owner intends to award a contract to repair North Boggy Creek storm sewer line from N. Third St. N. Van Buren St. on West Elem Ave. in the City of Enid. - F-2303C project. The work shall encompass the reparing of RCC Box in line one and repairing of egg-shaped Brick masonry storm sewer from line 2 to line 8. It has limited access locations. It is contractor's responsibility to make arrangements and safety of workers since it is under ground closed storm sewer line. The items included in this construction are as follows: 1. Reinforced Concrete Box Storm sewer. 5 -6-ft height x 7.5' ft span reinforced concrete box shaped a. existing storm sewer line at line one need repairs to improve stability functioning of storm sewer line. Repairs are clarified in to 3 conditions. Some areas rebars are exposed and rusted: Clean damaged concrete and rusted rebar. As per specification and drawing attached. Follow the construction method shown in 521.04-D-(2) (ODOT Specification SECTION 521- PNEUMATICALLY APPLIED MORTAR). Repairs are graded as 4 in attached repair locations b. Concrete Scaling Repair: Chip loose concrete until solid, clean with wire wheel, blow clean and Prepare and apply the Mortal as per the Follow the construction method given 521.04-D-(2). Repairs are graded as 3 in attached repair locations 2. a. Brick masonry joints repair: clean brick Masonry damaged area. Clean minimum 1" deep in to brick joints. Apply mortar as per the section 521.04. Repairs are graded as 3 in attached repair locations b. Brick masonry damaged area repair. Repair damaged places, Pipe intrusion, Missing brick areas, Cracks in bricks, cracked mortar, as per the specifications attaching using Pneumatically applied mortar. (ODOTSECTION 521-PNEUMATICALLY APPLIED MORTAR. Repairs are graded as 4 in attached repair locations

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents