Similar Projects
Reported | 06/22/2022 08:30 AM |
Project Title | West Patrick Street at Maryvale Ditch Stormwater Improvements - 350013 - City of Frederick |
Physical Address | View project details and contacts |
City, State (County) | Frederick, MD 21709 (Frederick County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $650,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The purpose of this task is to analyze the capacity of the existing culvert under West Patrick Street on Maryvale Ditch and develop and implement measures to alleviate the flooding at this roadway. This roadway is a major east-west arterial roadway and safe passage on it during flooding events is critical for first responders. The point of interest in this study is Maryvale Ditch at West Patrick Street. The study area for the hydrologic analysis is the Maryvale Ditch watershed. This watershed is approximately 0.78 square miles (499 acres) of highly urbanized land. Numerous residential and commercial developments are present in the watershed, as well as the U.S. Route 15- U.S. Route 270 interchange, and Frederick High School and West Frederick Middle School. Open land is limited in this watershed, with some open land in Maryvale Park near the point of interest and with the medians of the highway interchange. Deliverables associated with this project are: A study of the drainage basin to with recommended options for design and associated cost estimates (COMPLETE) Designs for the selected recommended improvements including Construction Documents and Specifications ready for bid (FY23) Acquisition of required rights-of-way or easements (FY23) Acquisition of required permits (FY23) Construction of selected recommended improvements (FY24) This project is in included in the City's or County's FY 2023-2028 Capital Improvement Plan (CIP). As of June 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |