Similar Projects
Detention Ponds Improvement Project
Post-Bid
Golden, CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Marion Street System, Phase 1
Results
$6,500,000 to $7,200,000 est. value
Denver, CO

Centennial Center Park Drainage Construction
Results
Centennial, CO 80112

Detention Pond Improvements
Post-Bid
Golden, CO

Removal of Asphalt Mat Ditch Grading, Placement of Topsoil and Seeding
Results
$1,000,000 to $5,000,000 est. value
CO

Denver Water - Eleven Mile Reservoir Outflow Flume Replacement
Post-Bid
Denver, CO

NWC Animal Health Building Soils Remediation
Results
Less than $2,214,000 est. value
Denver, CO 80216

Bridge Abutment Foundation Repair
Post-Bid
Lakewood, CO 80228

Drainage Improvements and Repaving of Zang Street and Coal Creek Yards
Results
$1,000,000 to $5,000,000 est. value
CO

64th Avenue Reinforced Concrete Box Culvert Fabrication
Post-Bid
Denver, CO

BAFB Enclave Erosion Control
Results
Less than $400,000 est. value
Greenwood Village, CO 80112

R3 Culvert Lining
Post-Bid
Denver, CO 80204

Veterans Memorial Cemetery - Stream and Pond
Results
Less than $800,000 est. value
Greenwood Village, CO 80112

Greenwood Gulch Undercrossing Improvements
Post-Bid
Greenwood Village, CO

Last Updated 05/14/2021 03:02 AM
Project Title

Removal of Portions of Present Structure, Removal of Fence and Facing Block

Physical Address View project details and contacts
City, State (County) Denver, CO 80239 (Arapahoe, Denver, Jefferson Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Wall Repair at Various Locations : Work Includes Removal of Portions of Present Structure, Removal Of Fence, Block Facing, Precast Panel Facing, Joint Sealant, Concrete Patching, Structural Concrete Stain, Reinforcing Steel, Vertical Drainage Wick, Shotcrete Item No. Description Quantity Units Major Items 504-04410 Block Facing 173.000 SF 601-03000 Concrete Class D 75.000 CY 626-00000 Mobilization 1.000 L S 630-00000 Flagging 100.000 HOUR 630-00012 Traffic Control Management 80.000 DAY 641-10000 Shotcrete 60.000 SY

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents