Similar Projects
Ream Creek Drain Reconstruction, Orchard Park Arm
Infrastructure
Bidding
IN

Big Cicero Creek Bank Stabilization
Infrastructure
Bidding
Tipton, IN

48" Precast Reinforced Concrete Pipe
Post-Bid
Indianapolis, IN 46077

Culvert Pipe, Metal and Plastic
Post-Bid
Connersville, IN

Scour Protection
Results
IN

Polymer Precoated Corrugated Steel Pipe and Couplings
Results
Indianapolis, IN 46077

Springfield Road Culvert Replacement
Construction
Mount Vernon, IN

2021 Drainage Improvements - Kaley Street and Marion Street
Infrastructure
Bidding
South Bend, IN 46614

Lake Lemon Sediment Improvement
Post-Bid
$1,500,000 to $2,000,000 est. value
Unionville, IN

Greenfield Avenue Culvert Over Lehr Ditch
Results
Noblesville, IN 46060

Corrugated Pipe For Washington Subdistrict
Infrastructure
Bidding

Drainage Structures 2021
Post-Bid
Paoli, IN

Steel Sheet Piling
Results
Indianapolis, IN 46077

Sunbeam Pond
Infrastructure
Bidding
Fishers, IN 46085

Pike Lake Shoreline Restoration
Post-Bid
Warsaw, IN 46580

Last Updated 08/20/2021 01:10 PM
Project Title

Clarence Widener 582 Regulated Drain

Physical Address View project details and contacts
City, State (County) Crawfordsville, IN   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish the labor, materials and equipment to install approximately; 1. 2,185 linear feet of 24" smooth-corr HDPE pipe, 2. 800 linear feet of 18” smooth-corr HDPE pipe, 3. 2,640 linear feet of 15” smooth-corr HDPE pipe, 4. 1,143 linear feet of 12” smooth-corr HDPE pipe, 5. 1,023 linear feet of 10” smooth-corr HDPE pipe, and all outlet structures, connections, bends, air vents, risers, tees, fittings, reducers, tap tees, grading, lateral connections and al l other items as detailed and shown on the “Itemized Proposal” and the plans. Furnish the labor, materials and equipment to destroy the existing tile.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents