Similar Projects
Last Updated | 08/20/2021 01:10 PM |
Project Title | Clarence Widener 582 Regulated Drain |
Physical Address | View project details and contacts |
City, State (County) | Crawfordsville, IN (Montgomery County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish the labor, materials and equipment to install approximately; 1. 2,185 linear feet of 24" smooth-corr HDPE pipe, 2. 800 linear feet of 18” smooth-corr HDPE pipe, 3. 2,640 linear feet of 15” smooth-corr HDPE pipe, 4. 1,143 linear feet of 12” smooth-corr HDPE pipe, 5. 1,023 linear feet of 10” smooth-corr HDPE pipe, and all outlet structures, connections, bends, air vents, risers, tees, fittings, reducers, tap tees, grading, lateral connections and al l other items as detailed and shown on the “Itemized Proposal” and the plans. Furnish the labor, materials and equipment to destroy the existing tile. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |