Similar Projects
Last Updated | 06/12/2023 07:32 AM |
Project Title | Joint Cryptologic Center (JCC) Building |
Physical Address | View project details and contacts |
City, State (County) | Aurora, CO 80011 (Arapahoe County) |
Category(s) | Entertainment/Recreation, Government/Public, Heavy and Highway, Industrial/Manufacturing, Sewer and Water |
Sub-Category(s) | Convention/Exhibit Center, Industrial Warehouse, Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $31,778,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *****AMENDMENT 0009***** The purpose of this amendment is to update the wage determinations, any responses are due NLT 22 May 2023 at 2:00 p.m. *************************************************************************************************************** *****AMENDMENT 0008***** The purpose of this amendment is to update the wage determinations. Revised price proposals as a result to the updated wage determinations are due 18 April 2023 by 2:00p.m. CST. *****AMENDMENT 0007***** The purpose of this amendment is to extend the Revised Price Proposlas due date to 16 March 2023 by 2:00p.m. CST. FAR 15.206(c) - Revised proposals are only requested from the initial offeror pool. No new offers are being accepted. *****AMENDMENT 0006***** The purpose of this amendment is to reissue the Door Schedule drawings, 2 drawings, and update the wage determionation. Revised Price Proposlas are due back 13 March 2023 by 2:00p.m. CST. FAR 15.206(c) - Revised proposals are only requested from the initial offeror pool. No new offers are being accepted. Extending the RFP proposal date to 13 March 23 at 2:00p.m. CST. ******************************************************************************* *****AMENDMENT 0005***** The purpose of this Amendment is to reissue 2 Spec sections and 23 drawings. Extending the RFP proposal date to 03 March 23 at 2:00p.m. CST ****************************************************************************************** Additional Projnet questions are being answered and amendment 0005 will be forthcoming. Extending the RFP proposal date to 28 Feb 23 at 2:00p.m. CST *****AMENDMENT 0004***** The purpose of this amendment is to add CAD and BIM File Download Instructions (for civil CAD files), 9 reissued spec sections, and 15 reissued drawings. The proposal date has NOT been extended. ***************************************************************** *****AMENDMENT 0003***** The purpose of this amendment is to submit the Site visit sign in sheets, Reissue 20 spec sections including the submittal register, Add new spec attachment (CID Package), Reissue 19 drawings, Add 3 drawings (boring logs), and Updated wage determination. The proposal date has been extended to 21 Feb 2023 by 2:00 p.m. CST. ********************************************************************* *****AMENDMENT 0002***** The purpose of this Amendment is to reissue 1 page of 32 11 23 and reissues 38 drawings. ************************************************************************* *****AMENDMENT 0001***** The purpose of this Amendment is to correct the address for the site visit, update wage determination, revise the language in Division 00 22 00 Section 7.4, extend proposal date to 10 Feb 2023 BY 2:00 P.M. CST, so that will adjust the closing comments for Projnet, and information on how to receive CAD and BIM files (Please see the other attachments that are uploaded seperatly from the SF30). *********************************************************************************** The Government intends to hold a site visit on 26 JAN 20123 at 1300 hours (1:00 p.m.) MST. For Additional details, contact: Riza Fattore, riza.p.fattore@usace.army.mil; (720) 692-6264. The contractors that attend the site visit shall arrive at: USACE Resident Office, 660 South Aspen Street Building 1005 Buckley SFB, CO 80011 See RFP provision 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) for additional details. |
||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, 30,000 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |