Similar Projects
Demolish Flight Pen, Install New
Term Contract
Design
$100,000 to $250,000 est. value
Gainesville, FL

Control Structure No. 9 Refurbishment Demolition and Electrical Work
Demolition, Alteration
Bidding
$200,000 est. value
Delray Beach, FL

SHIP Demolition and Reconstruction Project - North Street
New Construction, Demolition
Bidding
$200,000 est. value
Green Cove Springs, FL 32043

Demolition of 3125 / 3127 Dora Street, 3023 / 3025 Willard Street, and 3011 Franklin Court
Demolition
Post-Bid
Fort Myers, FL 33916

Prequalification for Annual Contract - Demolition
Demolition, Term Contract
Post-Bid
FL

1500 Dolgner Place Warehouse Demolition
Demolition
Results
Sanford, FL

Demolition of Four Townhome Properties - PQ-Demo
Results
Less than $60,000 est. value
Jacksonville, FL 32217

The Falls - Bloomingdales Demo
Demolition
Construction
Kendall, FL 33176

SHIP Demolition and Reconstruction Project - Lazy Lane
New Construction, Demolition
Bidding
$210,000 est. value
Keystone Heights, FL 32656

3307 Timberwood Road - Demolition
Demolition
Post-Bid
Lakeland, FL 33810

Demolition of Portable Classrooms and Site Restoration
Demolition, Term Contract
Results
Miami, FL

2535 Old Highway 60 - Demolition
Demolition
Post-Bid
Mulberry, FL 33860

Demolition of Three Properties
Demolition
Results
Less than $52,300 est. value
Jacksonville, FL 32205

150 Brewton Street - Demolition
Demolition
Post-Bid
Mulberry, FL 33860

Demolition of Vacant Single Family Home
Demolition
Results
$6,500 est. value
Bradenton, FL 34205

Last Updated 05/05/2022 03:02 AM
Project Title

140 West Flagler Building Demolition

Physical Address View project details and contacts
City, State (County) Miami, FL 33130   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,331,911
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of services consists of, and is not limited to, furnishing all materials, labor, services, supervision, tools, equipment, including all associated permits, and all other items necessary for the successful top-down controlled demolition of the 140 W. Flagler Street building of about 280,000 sqft and 16 stories, built in 1975, including but not limited to capping of existing utilities, hauling and proper disposal of demolished materials daily during demolition. Once the demolition is completed, the contractor shall be responsible to rough grade the site, leaving it leveled with no mound or depressions greater than six inches in any 10 feet horizontal distance. If any additional back-fill material is necessary, clean fill shall be furnished and installed by the contractor. The scope of work, includes, but are not limited to: 1. All trade permits required for demolition. 2. Full demolition of entire building, including foundations. 3. Remove generator to off-site location provided by MDC. 4. Install temporary fencing, gates, and protective scaffolding around building. 5. Placement of scaffolding and multiple trash chutes at two levels. 6. Demolition of all utilities, as per the construction documents. 7. Removal and off-site management of all material related oil and/or hazardous materials. 8. Collection, washing, load out, transportation and off-site management of all solid wastes. 9. Demolition of heavy building components. 10. Clean-up of entire site. 11. Restoration all damaged around the building, including the adjacent parking lot used for staging area, and the adjacent buildings.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents