Similar Projects
On-Call Duct Bank
Bidding
$10,000,000 est. value
Boston, MA

HVAC Improvements at Braintree Town Hall
Post-Bid
Less than $120,000 est. value
Braintree, MA 02184

Wood Preservation
Post-Bid
Quincy, MA

Three Phase Padmount Transformers
Results
Wellesley, MA 02481

Filter Influent Valve Replacement
Term Contract
Results
Less than $15,000 est. value
Needham, MA

New Sprinkler System in Existing Fire Station, Design and Install
Post-Bid
Less than $130,000 est. value
Medway, MA 02053

FY20 Lighting Upgrade Project
Results
Less than $650,000 est. value
Wellesley, MA 02482

Padmount Transformers
Post-Bid
Braintree, MA

Remove Remaining Existing Suspended Ceilings and Metal Grids
Results
Less than $30,000 est. value
Stoughton, MA 02072

Fire Station Sprinkler System
Post-Bid
Medway, MA 02053

Electrical Repairs and Upgrades - Rose Forte
Results
Stoughton, MA

Sandblast and Re-Coat Pressure Filter
Term Contract
Post-Bid
Less than $20,000 est. value
Walpole, MA 02081

Pedestrian Lights at the Heights
Results
Less than $50,000 est. value
Needham, MA 02492

Preventative Maintenance Inspections of Various HVAC Systems
Post-Bid
Less than $35,000 est. value
Braintree, MA

Pool HVAC II
Results
Less than $150,000 est. value
Westwood, MA 02090

Reported 06/25/2021 12:00 AM
Project Title

Five (5) Trade Contractor Packages - Sub-Bids

Physical Address View project details and contacts
City, State (County) Boston, MA   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Electric, Fire Protection, Flooring, HVAC, Painting
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $15,557,060
Plans Available from State Agency - 06/09/21
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. Five (5) Trade Contractor Packages (Track 1): Acoustical Tile (Track 1); Painting (Track 1); Fire Protection Sprinkler Systems (Track 1); HVAC (Track 1); Electrical (Track 1), for the McCormack State Office Building - Future of Work Renovations, Boston, MA. This project is for construction of renovations within a 21-story building located next to the State House in downtown Boston. The scope of work for this Project involves a total of approximately 170,000 square feet on 13 separate floors for 11 distinct agencies. Areas of renovation generally include offices, open workstation areas, conference and hearing rooms, support spaces, and kitchenettes.

Details

Division 09 - Finishes, Flooring, Painting.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents