Similar Projects
Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 est. value
Kansas City, MO 64121

Mace Road Sidewalks - City of Kansas City
Infrastructure
Conception
$260,000 est. value
Kansas City, MO 64152

Three Light
New Construction - 7,600 SF
Design
Kansas City, MO 64108

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

Baseline Improvements to Town Fork Creek
Infrastructure
Results
Kansas City, MO 64130

2022 Street Program
Infrastructure
Results
Blue Springs, MO

AC Rialto Hotel
Renovation, Infrastructure - 169,000 SF
Construction
$65,700,000 CJ est. value
Kansas City, MO 64106

One Nine Vine Mixed-Use Apartments - Phase I
New Construction - 128,432 SF
Construction
Kansas City, MO 64108

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Longview Tract by The Bay Water Park - City of Kansas City
Infrastructure
Conception
$315,000 est. value
Kansas City, MO 64134

Redwood Blue Springs
New Construction - 220,476 SF
Design
$10,000,000 CJ est. value
Blue Springs, MO 64015

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Last Updated 05/31/2023 09:40 AM
Project Title

Troost Avenue Apartments

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64110   (Jackson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $37,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 31, 2023, this project is in design. An architect has been assigned. Neither a general contractor nor a selection method has been disclosed yet. A firm construction timeline has not yet been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents