Similar Projects
Reported | 02/23/2022 12:00 AM |
Project Title | Lilly Street Reconstruction a Street to Third Street |
Physical Address | View project details and contacts |
City, State (County) | Moscow, ID (Latah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description: This project’s base bid includes the reconstruction of Lilly Street, from State Highway 8 to ‘A’ Street. The reconstruction work includes full depth street pavement replacement, sidewalk replacement, waterline replacement, storm sewer replacement, and sanitary sewer replacement within the street. Pedestrian curb ramps at intersections will also be replaced as needed to be in compliance with ADA requirements. The base bid also includes the realignment of Hog Creek, including replacement of a box culvert under Lilly Street, block wingwalls, excavation of a new creek channel, block wall, precast elbow, twin 54” culverts and precast headwall. This project’s add alternate includes the reconstruction of First Street, from Lieuallen Street to Lilly Street. The reconstruction work includes full depth street pavement replacement, sidewalk replacement, installation of new waterline, and new stormwater facilities |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |