Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

Constructing a New Eastbound Port of Entry (Poe) Facility on I-84 at MP 219 and Removing the Existing Cotterel POE
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value
ID

Intersection SH 47 Improvements, Ashton
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Pavement Markings
Term Contract
Bidding
Hayden, ID

Kathleen Avenue Improvements
Infrastructure
Post-Bid
Coeur d'Alene, ID 83815

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Improving Railroad Crossings
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
ID

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Term Contract
Post-Bid
Cascade, ID

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Rehabilitating Chestnut Street from Jackson Street to Cedar Street
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Genesee, ID

2022 Road Improvement Projects
Infrastructure
Post-Bid
Hayden, ID 83835

Reported 02/23/2022 12:00 AM
Project Title

Lilly Street Reconstruction a Street to Third Street

Physical Address View project details and contacts
City, State (County) Moscow, ID   (Latah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: This project’s base bid includes the reconstruction of Lilly Street, from State Highway 8 to ‘A’ Street. The reconstruction work includes full depth street pavement replacement, sidewalk replacement, waterline replacement, storm sewer replacement, and sanitary sewer replacement within the street. Pedestrian curb ramps at intersections will also be replaced as needed to be in compliance with ADA requirements. The base bid also includes the realignment of Hog Creek, including replacement of a box culvert under Lilly Street, block wingwalls, excavation of a new creek channel, block wall, precast elbow, twin 54” culverts and precast headwall. This project’s add alternate includes the reconstruction of First Street, from Lieuallen Street to Lilly Street. The reconstruction work includes full depth street pavement replacement, sidewalk replacement, installation of new waterline, and new stormwater facilities

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents