Similar Projects
RFP - A Street Lot 2
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Lake Wales, FL 33853

AutoZone #2853 / Auburndale
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Auburndale, FL 33823

Marigold Avenue Apartments
New Construction, Infrastructure
Design
$100,000,000 est. value
Poinciana, FL 34758

Waste Water Treatment Facility Improvements - Phase 2
Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Davenport, FL 33837

RFP D/B - SR 35 (US 98) From N of West Socrum Loop Rd to S of CR 54
Infrastructure
Bidding
$110,916,000 CJ est. value
Lakeland, FL 33812

Davenport Multifamily - All Trades
New Construction, Infrastructure - 491,783 SF
Sub-Bidding
$70,000,000 CJ est. value
Davenport, FL 33837

Posner Business Center
New Construction, Infrastructure - 72,212 SF
Post-Bid
$5,650,000 CJ est. value
Davenport, FL 33837

Leoma's Landing, Phase 1 - Site Development Improvements
Post-Bid
Lakeland, FL 33801

Lift Station No. 253 Upgrade
New Construction
Results
$1,678,500 est. value
Winter Haven, FL 33880

Reclaimed Water Ground Storage Tank and Pump Stations
Results
Haines City, FL 33844

Staybridge Suites Hotel / Winter Haven
New Construction, Infrastructure - 150,000 SF
Pending Verification
$22,600,000 CJ est. value
Winter Haven, FL 33880

Morgan Creek Preserve
New Construction, Infrastructure
Pending Verification
$22,000,000 CJ est. value
Lakeland, FL 33811

2022 Lake Alfred CRA Residential Facade Program
New Construction, Infrastructure
Design
$400,000 CJ est. value
Lake Alfred, FL 33850

Park Avenue / Market Plaza Streetscape
Infrastructure
Bidding
$12,000,000 CJ est. value
Lake Wales, FL 33853

Brentwood Phase 1 Improvements
Post-Bid
Haines City, FL

Last Updated 08/23/2022 10:04 AM
Project Title

Southeast Polk Wellfield Lower Floridan Aquifer Test Production Well No. 3

Physical Address View project details and contacts
City, State (County) Winter Haven, FL 33881   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,697,690 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to furnish all labor, materials, supervision, equipment, and incidentals necessary for the construction and testing of Test Production Well No. 3 and associated monitoring wells for the Polk County Regional Water Cooperative in accordance with plan sheets and project manual outlined in the bid documents. This selection is for three years of service, starting in 2022 and extending through 2024. All questions should be directed in writing to Ari Goldstein, Procurement Analyst via fax at (863) 534-6789 or via email at arigoldstein@polk-county.net. Deadline for submitting questions is Wednesday, June 15, 2022, 4:00 p.m. The construction cost estimate for the project is $3,301,000. WBE (6.9%) This project consists of construction and testing of four wells at the Southeast Wellfield for the Polk Regional Water Cooperative (OWNER) Southeast Lower Floridan Aquifer Water Production Facility (SE LFAWPF). The work will include construction of one (1) surficial aquifer monitor well (SE-TPW3-SA), one (1) upper Floridan aquifer (SE-TPW3-UFA) construction water source/monitor well, one (1) lower Floridan monitor well (SE-TPW3-LFA), and one (1) lower Floridan aquifer test/production well (SE-TPW3). SE-TPW3-LFA will serve as the hydrogeological test well for the site and SE-TPW3 will serve as a production well for the SE LFAWPF. B. Well SE-TPW3-LFA will be used as a test well to obtain data on the hydrogeology of LFA strata below the base of the production zone. A borehole will be drilled to the base of the LFA and then backplugged to the base of the production zone. C. The work shall be performed by a licensed Florida Water Well Contractor with equipment which is adequate to complete all phases of well construction. All work shall be completed in full conformance with South Florida Water Management District (SFWMD) and Florida Department of Environmental Protection (FDEP) rules and regulations for water wells, or these Specifications, whichever is more stringent. The CONTRACTOR shall establish his sequence of work based on requirements outlined in Sections 02050, 02051, 02052 and 02053. The contract time for this project is a total of 365 calendar days from Notice to Proceed to reach Substantial Completion and 425 calendar days from Notice to Proceed for Final Completion

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents