Similar Projects
Library Bond Projects
Renovation
Conception
$778,000 est. value
Monroe, NC

New Pender County Library
New Construction - 14,000 SF
Conception
$7,000,000 est. value
Burgaw, NC

Charlotte Mecklenburg Main Library
New Construction - 115,000 SF
Design
$100,000,000 est. value
Charlotte, NC 28202

Grace Library & Museum Building
New Construction - 85,000 SF
Design
Wilmington, NC 28401

Archives Library Building - Package J - Renovations
Renovation
Post-Bid
Raleigh, NC

CM at Risk for a New Southwest Regional Library and Associated Improvements
New Construction
Post-Bid
NC

Morrisville Town Center Core - Phase I
New Construction - 277,300 SF
Results
$13,000,000 to $44,400,000 est. value
Morrisville, NC

Conversion of Reception Desk to Work Room at Marshville Library
Renovation
Results
Marshville, NC 28103

Jacob Cornsilk Community Complex
New Construction - 46,370 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Robbinsville, NC 28771

Morrisville Town Center Core - Phase 1
New Construction
Pending Verification
Morrisville, NC 27560

North Regional Library Renovation
Renovation
Post-Bid
Raleigh, NC 27615

Library Construction Manager at Risk
New Construction
Results
Sanford, NC 27330

Stanford L. Warren Library Building Improvements
Renovation
Post-Bid
Durham, NC 27707

Gaston County Library Renovations
Renovation
Results
Gastonia, NC 28054

Development Services - Library and Senior Center Facility
New Construction, Infrastructure - 40,000 SF
Post-Bid
Concord, NC 28027

Reported 06/21/2022 03:08 PM
Project Title

Lee Early College and Library

Physical Address View project details and contacts
City, State (County) Sanford, NC 27330   (Lee County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected April 2026
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a mixed-use development in Sanford, North Carolina. Conceptual plans call for the renovation of a library. The Lee Early College is currently located in modular classroom space and needs a more permanent location. The current library is outdated and is not sized to meet the needs of our students. Project is included Lee County - Finance's FY 2023 - 2027 Budget CIP and funding is allocated for FY 2025. As of June 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Library - Public, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents