Similar Projects
Last Updated | 04/08/2020 09:19 AM |
Project Title | Construction of a New Army Reserve Center (ARC) at Newark, DE |
Physical Address | View project details and contacts |
City, State (County) | Newark, DE (New Castle County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct a 300 member Army Reserve Center (ARC) on the existing Newark, DE Armed Forces Reserve Center (AFRC) property. Primary facilities include construction of an ARC building, collocated Branch Maintenance Activity (BMA), and organizational storage building. ARC building and BMA will be combined and approximately 43,000 SF. The optional storage building will be approximately 3,000 SF. Buildings will be of permanent construction with reinforced concrete foundations; concrete floor slabs; reinforced concrete or masonry walls; low-slope or sloped roof; Heating, Ventilation and Air Conditioning (HVAC); and plumbing, mechanical, security and electrical systems. Supporting facilities include land clearing, paving, concrete aprons, vehicle wash rack/platform(s), fencing, general site improvements and utility connections. Accessibility for the disabled will be provided. Antiterrorism/Force Protection (AT/FP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 138 Tons). The project contains options such as: concrete or asphalt circulation areas, unheated storage building, and collateral equipment. |
||||||||||||||||||||||||||||||||||||
Details | ,, 46,000 SF - 1 Military Facility, Approximately 43,000 SF New Construction, 1 Warehouse/Storage, Approximately 3,000 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |