Similar Projects
Mardel
Renovation - 27,549 SF
Post-Bid
Springfield, MO 65804

Alchemy Office Infill
Build-Out - 1,873 SF
Post-Bid
Springfield, MO 65804

SMC Office Building
New Construction - 12,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Springfield, MO 65806

Truckmovers
New Construction - 21,445 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Springfield, MO 65802

SRC Holdings Office & Warehouse Phase III
New Construction - 413,477 SF
Post-Bid
$10,000,000 CJ est. value
Strafford, MO 65757

SRC Holdings Office & Warehouse Phase III
New Construction - 413,477 SF
Post-Bid
$10,000,000 CJ est. value
Strafford, MO 65757

Swet Cycle
New Construction - 1,188 SF
Post-Bid
Less than $500,000 CJ est. value
MO

Kuat Interior Office Expansion
Addition - 4,250 SF
Post-Bid
Springfield, MO 65803

Gardner Pediatric Dentistry
New Construction - 1,500 SF
Post-Bid
Less than $500,000 CJ est. value
Republic, MO 65738

Self-Storage Facility
New Construction - 6,000 SF
Design
Springfield, MO 65810

KKJ Wholesale Manufacturing & Warehouse
New Construction
Pending Verification
Springfield, MO 65802

Battlefield Towers Infill Suites 1-4
Renovation - 5,390 SF
Post-Bid
Springfield, MO 65804

Prefabricated Storage Building For Springfield Police Department
New Construction
Results
Springfield, MO

Drain Pro Plumbing
Renovation - 1,200 SF
Post-Bid
Springfield, MO 65802

540 E Commercial Street Office Improvements
Renovation - 13,142 SF
Post-Bid
Springfield, MO 65803

Last Updated 02/22/2022 05:10 PM
Project Title

Liberty Utilities Service Center

Physical Address View project details and contacts
City, State (County) Republic, MO 65738   (Greene County)
Category(s) Commercial
Sub-Category(s) Office, Warehouse/Storage
Contracting Method Construction Manager to Subcontract.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the construction of a new Service Center, including warehouse, fleet parking, office, and conference spaces.

Details

Office, New Construction, Warehouse/Storage, 11,200 SF New Construction, 1 Building.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents