Similar Projects
DFCM Construction UU Applied Sciences Building
New Construction
Design
$62,399,123 est. value
Salt Lake City, UT 84112

SLCC Jordan Solar Canopy Project
Renovation
Bidding
$549,000 CJ est. value
West Jordan, UT 84088

HPER Building Nursing Sim Lab CM/GC Services
New Construction
Post-Bid
Salt Lake City, UT

RFP Construction Manager - University of Utah - Interdisciplinary Computing Building
New Construction, Infrastructure - 209,000 SF
Post-Bid
$2,793,000 CJ est. value
Salt Lake City, UT 84112

UU Hper Office Remodel
Renovation
Results
$504,809 est. value
Salt Lake City, UT 84112

Salt Lake Community College (SLCC) Jordan Campus JHS Testing Center Remodel
Build-out
Results
$186,109 CJ est. value
West Jordan, UT 84088

HEDCO Renovation and Upgrade Room 130
Renovation
Construction
Salt Lake City, UT 84112

Medical Education and Discovery Building (MED X)
New Construction, Infrastructure
Construction
$129,285,000 CJ est. value
Salt Lake City, UT 84111

High Temp Water - Phase 4B
Addition, Demolition, Infrastructure, Renovation
Post-Bid
Salt Lake City, UT 84111

DFCM Construction Pre Qualified General Contractors-Board of Education Sound Studio Renovation
Renovation
Results
$150,000 est. value
Salt Lake City, UT 84111

DFCM - Applied Sciences Building University of Utah
Renovation - 40,720 SF
Construction
$59,000,000 CJ est. value
Salt Lake City, UT 84112

Student Center Renovation - Redwood Road Campus
Renovation - 177,185 SF
Post-Bid
$7,500,000 CJ est. value
Taylorsville, UT 84123

Art Building Terraced Classroom 158 Upgrade
Renovation
Results
$350,000 est. value
Salt Lake City, UT 84112

University of Utah (UU) Applied Sciences Building - Phase 3 - Bid Package 2
Addition, Demolition, Renovation, Infrastructure - 140,000 SF
Construction
$740,000 CJ est. value
Salt Lake City, UT 84112

Neilson Rehabilitation Hospital - NeuroRobotics Lab Buildout
New Construction, Build-Out
Post-Bid
$12,000,000 est. value
Salt Lake City, UT 84132

Last Updated 08/22/2023 02:33 AM
Project Title

RFP D/B - West Village Family and Graduate Housing Phase II

Physical Address View project details and contacts
City, State (County) Emigration Canyon, UT 84108   (Salt Lake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $150,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The initial contract will be for services provided during the design phase. Once a final scope of services is identified for the construction phase for commissioning, a change order will be negotiated for these services. If an acceptable fee cannot be negotiated, another SFC for commissioning services will be issued for the construction period. There is no representation or assurance that the entity awarded the services for the design phase will be issued a contract for the construction phase. Phase II also includes a proposed daycare and office space with the intent of replacing several services currently offered on the site with buildings that better suit student and staff needs. Unit mixes have been based off the Phase I and modified to meet proforma needs of the UU. The intent is that Building C2 be permitted first with substantial completion of July 2025, along with the CUP and the other two buildings complete in late Dec 2025 through a design/build process for the project. Bldg C2-153,763 SF Height 55\'6 ft-Type VA. The Daycare Bldg, Type 5B, 7265 SF 24.7ft high, and will be substantially complete in Dec 2025. E Bldg is 223,469 SF, Type 1A below the podium, Type 3B above the podium and 74ft in height. CUP is type VB, 2oft high and 1686 SF. R2 occupancy for Bldg C and E, Daycare is 1-4, CUP is occupancy U. Total sf is 385,000 and construction costs are $150,000,000.

Details

385,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents