Similar Projects
Water Treatment- Green Well
Post-Bid
Riverton, UT

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

4800 North Well Pumphouse
Results
Provo, UT 84606

Scipio Town Well Improvements
Post-Bid
Scipio, UT

Solids Control for Well in Paradox Basin
Results
Salt Lake City, UT

Walker Lane Well Rehabilitation
Post-Bid
$385,462 est. value
Holladay, UT 84117

DFCM Construction - UVU Central 1 Plant Well House Upgrade
Results
$666,000 est. value
Orem, UT 84058

Chlorination Updates - Hancock Well and Oak Street Well Projects
Post-Bid
Midvale, Sandy, UT 84094

Horizontal Well Riverfront Park
Results
South Jordan, UT 84095

Construction of the Valley Elementary Well Equipping
Post-Bid
$50,000 est. value
Eden, UT 84310

Kanarraville Well
Results
Less than $350,000 est. value
Cedar City, UT 84721

Alpine City Cup Filter Station Project
Post-Bid
Alpine, UT

900 East Well Rehabilitation Project
Term Contract
Results
Murray, UT 84121

Lehi City Sand Pit Well Development
Alteration
Post-Bid
Lehi, UT

Last Updated 11/05/2021 09:25 AM
Project Title

Well 7 Equipping

Physical Address View project details and contacts
City, State (County) Saratoga Springs, UT 84045   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a vertical turbine well pump house for use in either drinking water or pressurized irrigation systems. The pump house includes a masonry building with standing seam metal roofing with vertical lineshaft turbine pump, piping, valves, flowmeter, chemical feed and monitoring systems, and appurtenances; inlet/outlet piping; site work; grading, storm water piping, asphalt, gravel access road and parking area, fencing, and concrete sidewalk. The Work also includes electrical connections to and electrical work associated with the pump station, backup emergency generator with CMU sound wall, HVAC, and telemetry wiring for OWNER provided RTU and a Security Camera System.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents