Project Title | Broad Run Water Treatment Plant Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Saint Thomas, PA 17252 (Franklin County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes the installation of approximately 720 L.F. of 42 inch diameter ductile iron contact piping and fittings (supplied by the Owner) Excavation, backfill site work and grading. Connections to existing piping. Installation of 4", 1 O" and 12" ductile iron pipe and fittings. Concrete weir box. Installation of a tank mixer, instruments, sample pump (supplied by the Owner) and miscellaneous electrical work. The successful bidder will be required to comply with Prevailing Minimum Wages in accordance with the PA Department of Labor & Industry Prevailing Wage Determination. The Contractor is subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended. The Act and amendments require that the Contractor use or furnish only steel products (as defined in the Act and amendments) which have been produced in the United States. Each bid must be accompanied by a Certified or Bank Check; or Bid Bond naming as payee or obligee (as applicable), the Bear Valley Franklin County Pennsylvania Joint Authority, in the amount of five percent (5%) of the total amount of the bid as security for proper execution of the Agreement and submitting other documents as required by the Bidding Documents. No bids may be withdrawn, except when the Bidder(s) comply with the withdrawal requirements of Act No. 4 of the General Assembly of Pennsylvania, Senate Bill 793, Printers No. 1655, as amended. The Successful Bidder will be required to execute the Agreement and to furnish a performance and payment bonds, each of said bonds to be in the amount of one hundred percent (100%) of the Contract Price, all in the respective forms provided in the Bidding Documents. The Contractor also will be required to furnish evidence of insurance coverage as required by the Bidding Documents. All bonds shall be executed by sureties named in "Circular 570 - Companies Holding Certificates of Authority as Acceptable Sureties in Federal Bonds and as Acceptable Reinsuring Companies" (current publication) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department. Bear Valley Joint Authority reserves the right to reject any or all bids or parts thereof or items therein, to waive any defects or irregularities in the Bids, and to accept any Bid which, in its judgment, is for its best interest. Bids shall remain open for a period of sixty (60) days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shatl remain open for a period of one hundred twenty (120) days from the date of Bid opening. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |