Similar Projects
New Police Facility - City of Pullman
New Construction, Infrastructure
Conception
$8,250,000 CJ est. value
Pullman, WA 99164

Fire Station 3 - City of Pullman
New Construction, Infrastructure
Conception
$6,500,000 CJ est. value
Pullman, WA 99163

RFQ D/B - Construction of ARS/WSU Plant Bioscience Research Building
New Construction, Infrastructure - 113,703 SF
Post-Bid
$89,000,000 CJ est. value
Pullman, WA 99163

M and O Expansion Grading 2022
Infrastructure
Post-Bid
Pullman, WA

Albion Drive Roundabout Improvements
Demolition, Alteration
Results
WA

Albion Drive Roundabout Improvements
Demolition, Alteration
Results
WA

Pullman-Moscow Regional Airport - PMRA Terminal 2020
New Construction, Infrastructure
Construction
$49,000,000 CJ est. value
Pullman, WA 99163

Pullman Regional Hospital - Patient Care Expansion
Addition, Demolition, Build-out, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Pullman, WA 99163

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

SR 26, Dusty to Colfax Add Climbing Lanes
Infrastructure
Post-Bid
$5,000,000 to $7,500,000 est. value
Lacrosse, WA 99143

Terre View Roundabout
Infrastructure
Results
Pullman, WA 99163

Accelerated Streets Resurfacing 2022
Infrastructure
Post-Bid
$368,000 est. value
Pullman, WA

2022 Eastern Region Chip Seal - South
Infrastructure
Results
$7,000,000 to $10,000,000 est. value

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Last Updated 04/29/2023 01:04 AM
Project Title

Roadways: Pave Stadium Way Nevada to Grimes

Physical Address View project details and contacts
City, State (County) Pullman, WA 99163   (Whitman County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $199,970 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is intended to grind away the top 2" of existing asphalt and replace with new asphalt per design specs. This work will take place for approximately 1,400 linear feet of roadway along Stadium Way from Nevada Street to the entrance of the Smith Center Parking Lot. Stadium way is a 4-lane roadway with a concrete center median for most of this section. Grind and Replace Asphalt from Smith Center Parking Lot to Grimes Way Grind and Replace Asphalt from Grimes Way to Wilson Road. Owner reserves the right to reject any and all bids and to waive any informalities or irregularities in the bids received *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions received less than 5 Days before the time of bid opening may not be answered. All issued addenda shall be incorporated into these Contract Documents.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents