Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, NC

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Post-Bid
Less than $775,000 est. value

Cale Elementary School Safe Routes to School
Results
$300,000 to $500,000 est. value
Charlottesville, VA 22902

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2021 Plant Mix
Results
Less than $2,400,000 est. value

SGR - 2021 Plant Mix
Results
$3,906,000 est. value

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

ACSA Operations Center Paving Project
Infrastructure
Results
Charlottesville, VA 22911

2022 Latex Modified
Infrastructure
Results
$2,130,000 est. value

2022 Surface Treatment
Infrastructure
Results
$875,000 est. value

2022 Slurry Seal
Infrastructure
Results
$2,715,000 est. value

2022 Latex Modified
Infrastructure
Results
$2,467,000 est. value

Paving Services
Term Contract, Alteration
Results
Charlottesville, VA

2022 Surface Treatment
Infrastructure
Results
$4,361,000 est. value

2022 Latex Modified
Infrastructure
Results
$852,000 est. value

Last Updated 07/01/2022 03:56 PM
Project Title

Rio Road Corridor Improvement - County of Albemarle

Physical Address View project details and contacts
City, State (County) Rio, VA   (Albemarle County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rio Road Corridor Improvement Plans call for corridor improvements on Rio Road from Old Brook Road to John Warner Parkway. Project will consist of two phases. As of August 5 2021, a study is being done on this project with the county and the consultant. This project has been approved for funding. A study is anticipated to be completed in November/December of 2021. Construction is not anticipated to begin until 2025 at the earliest. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents