Similar Projects
East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

CM at Risk - Partial High School Replacement and Junior High School/High School Renovation
Renovation
Results
Toulon, IL 61483

2021 Life Safety Implementation
Results
Kangley, Streator, IL 61364

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Construction
Less than $4,200,000 est. value
Argenta, IL 62501

Kankakee Junior High School 2022
Renovation, Addition
Construction
Kankakee, IL 60901

2021 School Improvements
Renovation
Post-Bid
Sycamore, IL 60178

2021 Remodeling and Addition at Kankakee High School
Renovation, Addition
Results
Kankakee, IL 60901

LIFT Innovation Center
Renovation - 49,700 SF
Construction
Mattoon, IL 61938

Welding Classroom Work at the Mercer County High School
Renovation
Post-Bid
Aledo, IL 61231

Interior Renovations
Results
Less than $120,000 est. value
Akin, IL

Metal Building
Renovation
Post-Bid
McLeansboro, IL

Renovations to Existing Science Lab
Renovation
Results
Table Grove, IL

Concrete Work at MHS Football Field Home Bleacher Site
Alteration
Post-Bid
Mattoon, IL 61938

High School Gym Building Refacing & Window Replacement
Renovation
Results
Cerro Gordo, IL 61818

Last Updated 05/17/2022 12:16 PM
Project Title

Chelsea Addition and Interior Renovation

Physical Address View project details and contacts
City, State (County) Frankfort, IL 60423   (Will County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 11/15/21
Owner View project details and contacts
Architect View project details and contacts
Description

1 – General Trades; 2 – Demolition; 3 – Concrete & Site Concrete; 4 – Masonry; 5 – Structural Steel & Misc. Metals; 6 – Doors, Frames, Hardware; 7 – Millwork & Casework; 8 – Roofing; 9 – Metal Panels; 10 – Glass& Glazing; 11 – Framing & Drywall; 12 – Acoustical Ceilings & Wall Panels; 13 – Flooring & Ceramic Tile; 14 – Terrazzo & Epoxy Flooring; 15 – Paint & Wallcovering; 16 – Lockers; 17 – Elevator; 18 – Fire Protection; 19 – Plumbing; 20 – HVAC; 21 – Electrical/Fire Alarm/IT/AV; 22 – Excavation & Earthwork; 23 – Site Utilities; 24 – Asphalt Paving; 25 - Landscaping

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents