Project Title

BWI Thurgood Marshall Airport Concourse A/B Connector and Baggage Handling System

Physical Address View project details and contacts
City, State (County) Glen Burnie, MD   (Anne Arundel County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $30,000,000 to $50,000,000
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The result of the A/B Connector and Baggage Handling System project will be a two (2) level building addition between Concourses A and B that will provide a new baggage handling system and expanded restrooms, concessions, and holdrooms. In addition, the terminal expansion will allow for direct connections from the new building into Concourses A and B thus reducing walking distance for connecting passengers. The project involves the construction of an approximately 128,000 square foot addition to Terminal A/B and the renovation of approximately 37,000 square feet within existing Terminal A-B. The addition will consist of two (2) primary levels - Apron Level and Departures Level. For access to the Documents for GMP Package No. 1A, please contact the Clark Construction Group, LLC team member(s) associated with the respective trade package(s) listed below: 1. General Contractor Administrative Facility Trailers - Luana Pego - luana.pego@clarkconstruction.com 2. Temporary Partitions and Weather Barriers - Curran Johnson - curran.johnson@clarkconstruction.com 3. Utility Locating at Administrative Facility - William Richardson - william.richardson@clarkconstruction.com 4. Plumbing Utilities at Administrative Facility - Marshal Hoffman - marshal.hoffman@clarkconstruction.com 5. Pavement Markings at Administrative Facility - William Richardson - william.richardson@clarkconstruction.com 6. Site Improvements for Administrative Facility - Luana Pego - luana.pego@clarkconstruction.com 7. Power & Lighting Provisions for Administrative Facility - James Hannigan - James.Hannigan@clarkconstruction.com 8. Site Electrical Utility Relocations - James Hannigan - James.Hannigan@clarkconstruction.com 9. Baggage Handling Systems - Sean Fitzpatrick - sean.fitzpatrick@clarkconstruction.com

Details

,, 165,000 SF - Airline/Passenger Terminal, 128,000 SF New Construction, Building, Airline/Passenger Terminal, 37,000 SF Renovation, Building.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts