Similar Projects
Ft. Knox V Corps Repair of a Controlled Area
Renovation
Design
$10,000,000 to $25,000,000 est. value
Fort Knox, KY

Microgrid Facility
New Construction
Design
$10,000,000 to $25,000,000 est. value
Fort Campbell, KY

SOF MOUT Site Expansion
New Construction
Bidding
$1,000,000 to $5,000,000 est. value
Fort Campbell, KY

Various Small Construction Projects within the Boundaries of Great Lakes and Ohio River Divisions
Renovation, Addition, Demolition, Term Contract
Post-Bid
Less than $90,000,000 est. value
Chicago, IL - Louisville, KY - Detroit, MI - Allegany, Buffalo, NY - Nashville, TN - Huntington, WV

Ft. Campbell, KY. Dodea Cold Storage Facility
Build-Out
Post-Bid
$500,000 to $1,000,000 est. value
Fort Campbell, KY

Buechel RC Latrine Renovation
Renovation
Results
$326,432 est. value
Louisville, KY 40218

Barbourville Readiness Center Latrine Upgrade
Renovation
Results
$1,608,194 est. value
Barbourville, KY 40906

Construct Joint Force Headquarters BNGC
Renovation
Post-Bid
$14,661,586 est. value
Frankfort, KY 40601

Springfield Readiness Center Interior
Renovation
Results
$1,246,573 est. value
Springfield, KY 40069

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

Secure Room
Renovation
Results
$80,450 est. value
Frankfort, KY 40601

Fort Campbell Multiple Award Task Order Contract (MATOC)
New Construction
Post-Bid
$250,000 est. value
Fort Campbell, KY

Reported 02/19/2022 12:00 AM
Project Title

Restoration and Remediation Services

Physical Address View project details and contacts
City, State (County) Fort Campbell, KY (Christian (KY) - Montgomery, Stewart (TN) Counties)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Restoration and Damage Mitigation Services. contract will provide the following Restoration and Damage Mitigation services: - Fire and Smoke Restoration - Water Damage Restoration and Remediation - Odor Removal - BIO-Hazard (trauma) and sewage clean-up - Board-up and Tarping - Mold Remediation - Air duct cleaning - Renovation Services, incidental to the restoration process - ACM mitigation and removal incidental to the restoration process

Details

Military Facility, Renovation.
Division 02 - Existing Conditions, Site Remediation, Water Remediation, Facility Remediation, Mold Remediation, Mold Remediation Clearance Air Sampling.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents