Similar Projects
Indoor Youth Sports Complex
New Construction
Conception
$11,000,000 est. value
Lawton, OK 73507

2023 Bond - Union Public Schools
Addition, Demolition, New Construction, Infrastructure, Renovation
Conception
$152,000,000 CJ est. value
Tulsa, OK 74103

University Of Tulsa Thomas Plaza
Renovation, Alteration
Design
Tulsa, OK 74104

L. Dale Mitchell Park Expansions and Enhancements
Addition, Renovation, Infrastructure
Design
$30,000,000 CJ est. value
Norman, OK 73019

SSC Wellness Center (Natatorium) Renovation
Renovation
Bidding
$1,000,000 CJ est. value
Seminole, OK 74868

Football Dressing Room Addition and New Softball Batting Facility
Addition, Demolition, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Healdton, OK 73438

University Research Park Building 755 Third Floor Renovations
Renovation
Sub-Bidding
$5,108,000 CJ est. value
Oklahoma City, OK 73104

Re-Roofing at High School Gymnasium
Renovation
Sub-Bidding
$400,000 CJ est. value
Mannford, OK 74044

Piedmont Middle School
New Construction
Post-Bid
$16,000,000 est. value
Piedmont, OK 73078

McAlester Middle School and Event Center
New Construction - 100,000 SF
Post-Bid
$25,000,000 est. value
McAlester, OK 74501

OU Rowing Training Room
New Construction
Results
Norman, OK 73019

Gymnasium at Wilson Elementary School
New Construction
Results
$3,500,000 est. value
Oklahoma City, OK 73103

Indoor 18
New Construction
Construction
Oklahoma City, OK 73114

Duncan High School Tennis Locker Room
Renovation
Construction
$288,000 CJ est. value
Duncan, OK 73533

Campus Classroom/Office Building
New Construction - 3,800 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Durant, OK 74701

Last Updated 07/25/2023 10:59 AM
Project Title

OSU Boone Pickens Stadium Enhancements - Phase 2

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74075   (Payne County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, College/University
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

**Note from CM: Bid Package 11J.2 - Wall Pads has been removed from this bid. It will be redesigned, re-advertised and bid in the future. Boone Pickens Stadium Seating Enhancement Project - Southside Phase 2 Oklahoma State University, hereinafter referred to as Owner and Flintco, LLC, hereinafter called the Construction Manager. This project at Boone Pickens Stadium includes seating bowl enhancements including replacing the existing cast in place and steel bent plate treads and risers for the North and South Sidelines with long span aluminum treads and risers and bench seating. In addition, alignment of the 200 level vomitories with the 300 level vomitories, adding additional intermediate aisles and handrails, and providing additional wheelchair spaces within the seating bowl. The existing concrete field wall will be removed and reconfigured in concrete with a coping cap in the northeast and southeast portions of the stadium. Existing field wall pads will be removed and new wall pads will be installed around the entire perimeter of the field. The new bowl configuration will include chairback seating, loge box and terrace seating areas. Provision of the required number of wheelchair spaces to meet current 2010 ADA Standards for Accessible Design will be included as part of the project. The overall stadium seating capacity will be reduced as part of the renovation. The west endzone portion of the stadium will have the existing bench seating and supports removed along with the removal of the existing traffic coating, expansion joint and control joint materials currently in place. The existing precast stadia will be prepped for new traffic coating, new expansion and control joints will be provided. The existing bench seating will be reinstalled to their original locations. Rails will be reinstalled and painted. New rails will be provided as needed. **Estimate Value listed is for the Overall project INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS: Should a Bidder find discrepancies in, or omissions from, the bid documents, or be in doubt as to their meaning, he must notify the Construction Manager in writing seven (7) calendar days prior to the bid opening. Replies shall be issued to all bidders of record by Addendum or CM Clarification to the bid documents and shall become part of the contract. The Owner shall not be responsible for oral clarification. All addenda or CM clarification items issued during the time of bidding shall be covered in the bid and acknowledged on the proposal. The Contract and Bidding Documents will be available at Gill Reprographics. Copies of the contract and bidding documents may also be reviewed at the

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents