Similar Projects
2020 Roadway and Drainage Improvement Program
Bidding
Marlboro, NJ

Vardon Way Pipe Grouting
Post-Bid
Howell, NJ

Furnish and Deliver Concrete Pipes
Post-Bid
Freehold, NJ 07728

Camp Evans Drainage Improvements
Results
Wall, NJ 07719

Sea Bright to Manasquan, NJ, Project
Results
$25,000,000 to $30,000,000 est. value
Manasquan, NJ 08736

Worthington Avenue Outfall Improvements
Post-Bid
Spring Lake, NJ 07762

2019 Biennial Maintenance Contract for Emergency and Maintenance Repair Service for Water, Sanitary Sewer and Drainage
Term Contract
Results
Matawan, NJ 07747

Crawford Street Roadway Improvements
Post-Bid
Shrewsbury, NJ 07724

Plymouth Drive Culvert Replacement
Results
Freehold, NJ 07728

Church Road Drainage Improvements and Stream Cleaning
Post-Bid
Marlboro, NJ 07746

Maintenance Timber/Underwater/Drainage Structural Repair Contract, Central - 2020
Results
$5,000,001 to $10,000,000 est. value

2020 Roadway Improvement Program - Poets Annex, Phase I and ADA Improvements
Post-Bid
Manalapan, NJ 07726

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Drainage Improvements on Weston Avenue
Post-Bid
Wanamassa, NJ 07712

Monmouth Parkway Drainage Improvements
Results
$87,477 est. value
Monmouth Beach, NJ 07750

Reported 01/08/2021 01:13 PM
Project Title

Port Monmouth, Phase 2, Contract 4A

Physical Address View project details and contacts
City, State (County) Port Monmouth, NJ 07718   (Monmouth County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $2,000,000 to $3,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work will require regrading of State Route 36 that is under NJDOT jurisdiction (80 linear feet on the northbound side and 125 linear feet on the southbound side) and regrading a property along Wilson Avenue. Utility relocations include overhead electric and telecommunications poles and lines, and underground water, gas, and sanitary sewer mains. Additional project requirements include vibration monitoring, traffic control and signs, fencing, planting and seeding, soil erosion and sediment control measures, site restoration, and liability insurance. This work will be accomplished as part of a base bid contract with options.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents