Similar Projects
Celanese Clear Lake Phase II
New Construction, Addition
Conception
Pasadena, TX 77507

VGXI Inc
New Construction - 240,000 SF
Conception
Conroe, TX 77303

Distillery Campus
New Construction - 10,561 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Waco, TX 76708

United Alloy Manufacturing Facility
New Construction - 200,000 SF
Design
$35,000,000 est. value
Seguin, TX 78155

921 West Commerce Street Commercial Kitchen
Renovation - 19,805 SF
Post-Bid
$3,000,000 est. value
Dallas, TX 75201

Cordeck Building Solutions
New Construction - 34,050 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Denton, TX 76207

Feedmill Repairs - Phase II
Results
Overton, TX 75684

Paradigm Metals Headquarters
New Construction - 100,000 SF
Construction
Hutto, TX 78634

Oak Creek Homes Plant Expansion
New Construction - 51,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Lancaster, TX 75146

Warehouse Sortation Facility
Renovation
Pending Verification
$20,000,000 est. value
San Antonio, TX 78220

CoffeeTech Industries Headquarters and Manufacturing Facility
New Construction - 112,000 SF
Conception
$56,000,000 est. value
Seguin, TX 78155

Gourmet Ranch Meat Plant
New Construction - 38,757 SF
Design
$10,000,000 est. value
Houston, TX 77086

WL Plastics Manufacturing Facility
New Construction - 59,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Fort Worth, TX 76177

Freshpet Manufacturing Facility
New Construction - 400,000 SF
Design
$10,000,000 CJ est. value
Ennis, TX 75119

John Crane Tenant Improvement
Renovation, Addition - 596 SF
Construction
$150,000 est. value
Pasadena, TX 77507

Reported 02/06/2020 04:15 PM
Project Title

Continental Automotive Plant

Physical Address View project details and contacts
City, State (County) New Braunfels, TX 78130   (Comal County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Qualified Bidding.
Project Status Construction Documents, Construction Start Expected second quarter 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, Approximately 215,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents