Similar Projects
Z--Tyzack Pumping Plant Regulating Tank Coating
Term Contract
Design
Vernal, UT

Z2ne--660 (Con) Engineering / 660-15-112 / Construct Emergency Water Storage Attn Jason Thomas (Va-20-00099402)
Term Contract
Design
$2,000,000 to $5,000,000 est. value
Salt Lake City, UT 84148

Lower Spring Creek Tank #3
Infrastructure
Bidding
$5,075,000 to $5,228,000 est. value
Springville, UT 84663

General Contractor Prequalification - Heritage Park 10 MG Water Tank Project
Infrastructure
Bidding
Orem, UT

Automated Brine Maker System With Vertical Storage Tanks
Post-Bid
Orem, UT 84057

Zone 2 and 3 Tanks Project
Post-Bid
Herriman, UT 84096

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Construction
Orem, UT

Hyde Park Water Improvements 2020 2.0 MG Concrete Water Tank
Post-Bid
Hyde Park, UT

World-Wide Water Storage Tank Remediation
Term Contract
Results

Construction of the Upper Telluride Penstock Pipeline Replacement Phase 1
New Construction, Infrastructure
Post-Bid
Beaver, UT

Design/Build Elevated Water Tank Aneth
Results
$100,000 to $250,000 est. value
Aneth, UT 84510

Santaquin Zone 11W Tank and Booster Pump CM/GC
New Construction
Post-Bid
Santaquin, UT 84655

Enoch City Tank and Booster Project
Results
Less than $110,000 est. value
Enoch, UT 84721

Last Updated 12/17/2021 10:45 AM
Project Title

Tuacahn Tank Recoating

Physical Address View project details and contacts
City, State (County) Ivins, UT 84738   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results, All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Tuacahn tank is located near 1055 North on Tuacahn Drive, at which location is a 420,000 gallon welded steel tank 45-foot diameter, 38-foot in height. The scope of the work involves sand blasting the interior coating and recoat with a three-coat epoxy and overcoating the exterior of the tank.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents