Similar Projects
Chemical Treatment of Deep Wells
Bidding
East Saint Louis, IL

Chemical Treatment of Deep Wells
Bidding
East Saint Louis, IL

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Phase 2 Installation of Monitoring Wells and Probes
Renovation
Results
Hanover Park, IL 60133

Improvements to City Well Number 31
Results
Naperville, IL 60540

Well No. 21 (Division A)
Bidding
Normal, IL

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

Well No. 21 (Division B)
Bidding
Normal, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

Well 6 Repairs
Bidding
Antioch, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Last Updated 06/29/2020 12:52 PM
Project Title

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement

Physical Address View project details and contacts
City, State (County) Naperville, IL 60540   (DuPage County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Northwest Water Works Booster Pump VFD Installation: The work to be performed under this contract consists of the installation of VFD’s for booster pump #1 and booster pump #3, which includes but not limited to the following work: modify existing MCC as shown on the plan, install VFD enclosure, switch breaker, line and load reactors, motor overload protection, bypass run, contract relays, controls, associated wire/cables and modify existing SCADA/PLCs. South Operations Center VFD Replacement: The work to be performed consists of the replacement of the existing pump #4 VFD. Replace the power cables and signal wires between new VFD and circuit breaker.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents