Similar Projects
Replace Portable Bleachers in Gym William E. Orr Middle School
Renovation
Bidding
$126,644 est. value
Las Vegas, NV 89119

Lincoln County Fairgrounds Recreation Park Phase III
Renovation
Post-Bid
Panaca, Pioche, NV 89042

Design Build - Outdoor Bleacher
New Construction
Post-Bid
North Las Vegas, NV 89081

Nellis Meadows: Park Improvements Irrigation Renovation and North Parking Lot Rehabilitation
Results
$4,966,543 to $5,227,941 est. value
Las Vegas, NV

Replace Playground Equipment and Safety Surface Systems
Renovation
Results
Las Vegas, NV 89121

MLK & Coralie Single Family Homes
New Construction
Construction
North Las Vegas, NV 89032

Coral Academy of Science
New Construction - 105,000 SF
Construction
$30,000,000 est. value
Henderson, NV

Bicentennial Marketplace - Pad F
New Construction - 16,224 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Henderson, NV 89044

Replace Playground Equipment and Safety Surface Systems Northeast Group 2
New Construction
Post-Bid
Las Vegas, North Las Vegas, Searchlight, NV 89101

Resurfacing of Cheyenne Sports Walking Track
Results
North Las Vegas, NV

The Mcgill Ballpark South-West End Renovation
Renovation
Post-Bid
McGill, NV 89318

Hollywood Regional Park: Site Improvements Hollywood Regional Park: SNPLMA Walking Trail
Renovation
Results
$19,928,860 to $20,977,749 est. value
NV

Green Valley Park Improvements
Infrastructure
Post-Bid
Fernley, NV

2021 Safety Surface Maintenance
Renovation
Results
Less than $523,000 est. value
Henderson, NV

Courthouse Park, Phase II
Renovation
Post-Bid
NV

Reported 03/31/2022 12:00 AM
Project Title

Replacement of Track at Sparks High School

Physical Address View project details and contacts
City, State (County) Sparks, NV 89431   (Washoe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace the all weather track. Work includes removal, regrading and replacing asphalt, base and concrete areas as drawn and specified. Estimate: Engineer/Architect Estimate $500,000.00 + Force Account $50,000.00 = Total $550,000.00

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents