Similar Projects
2023 Street Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Charleston, MS 38921

2023 Street Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Charleston, MS 38921

Hayes and Flowers Street Drainage Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Tutwiler, MS 38963

Construction of 5.350 Miles of Overlay on the Willis Road
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Tutwiler, MS 38963

Overlay Approximately 11 miles on SR 35 from the North End of Bridge No. 248.1 to the Panola County Line
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Charleston, MS 38958

Tutwiler Sidewalk Improvements
Infrastructure
Results
$483,296 CJ est. value
Tutwiler, MS 38963

Echols Drive and Mitchell Road Bank Stabilization Emergency Watershed Protection (EWP)
Infrastructure
Construction
$355,200 CJ est. value
Charleston, MS 38921

Tallahatchie County Friendship Road and Pine Hill Chruch Road
Infrastructure
Post-Bid
$400,000 CJ est. value
Charleston, MS 38921

Teasdale Road Site 6 & Cedar Street Bank Stabilization Emergency Watershed Protection
Infrastructure
Results
$135,825 CJ est. value
Cascilla, MS 38920

Shade Street Swimming Pool
New Construction, Infrastructure
Post-Bid
$1,305,000 CJ est. value
Charleston, MS 38921

Sewer System Improvements
Infrastructure
Results
$392,000 CJ est. value
Charleston, MS 38921

Teasdale Road, Eskridge Extended, & Marshall Street Overlay
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Enid, MS 38927

Shook Road Bank Stabilization
Infrastructure
Results
$139,381 CJ est. value
Cascilla, MS 38920

Cedar Grove Lake Auxiliary Spillway Emergency Watershed Protection (EWP) Bank Stabilization
Infrastructure
Post-Bid
$300,000 CJ est. value
Charleston, MS 38921

Front Street Bank Stabilization
Infrastructure
Results
$211,000 CJ est. value
Charleston, MS 38921

Last Updated 07/12/2023 04:19 PM
Project Title

Blues Park - Walking Trail & Phase 1A Site Elements

Physical Address View project details and contacts
City, State (County) Tutwiler, MS 38963   (Tallahatchie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the following scope of work: demolition of the existing site elements (with the exception of areas/elements not within the construction limits or items not labeled for removal on the Demolition Plan) such as, but not limited to: foundations, utilities, concrete paving, fencing, gravel areas, trees, signage, and other elements as noted, construction of one construction entryway which access Holly Street, as well as the construction of a concrete walking trail which includes color concrete paving in key areas, trail markings within the trail surface, site grading, irrigation sleeving, and erosion control measures. All demolition debris will be removed from the site and disposed on in a legal manner (this means that no demolished items/elements/material can be disposed of or sold to any entity within the city limits of the Town of Tutwiler). The site once free of all construction debris and walking trail installed, there will be sodding and seeding per the drawings and of all disturbed areas. There are also seven Add Alternates for this project Requests for interpretation should solely be addressed to the Consultant either in writing or via email; no telephone or verbal questions will be answered. No oral interpretation will be made to any bidder as to meaning of drawings and specifications. Requests for interpretation will be accepted up to ten (10) calendar days prior to date set for opening of bids. Question Deadline 06/13/2023

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents