Similar Projects
Boat Storage Facility
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Gloucester, MA

Little Beach Pier and Beach Maintenance Project
Conception
Falmouth, MA 02114

Drydock and Overhaul Services for the M/V Gayhead
Bidding
Falmouth, MA

Two Float Replacements
Bidding
Bourne, MA 02532

Rehabilitate Existing Timber at Eastern and Southern Piers
Post-Bid
Less than $618,000 est. value
Boston, MA

Regatta Point Waterfront Rehabilitation
Post-Bid
Less than $618,000 est. value
Boston, MA

Removal and Replacement of Pilings, Floats, and a Gangway Located on the Onset Pier
Results
Less than $339,373 est. value
Onset, MA

Z--CACO - Replace Marconi Beach Stairs
Results
Wellfleet, MA

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Neponset Landing II Spray Deck Renovation Demolition
Post-Bid
Less than $800,000 est. value
Boston, MA 02114

Owen Park - Pier Repair for the Harbor Master
Results
Less than $50,000 est. value
Tisbury, MA

Owner's Project Manager for New Bedford State Pier
Renovation
Post-Bid
$1,700,000 est. value
New Bedford, MA

Y--Hellcat Trail Boardwalk Replacement @ PR NWR
Results
Newburyport, MA 01950

Middle Wharf Wale System Replaced
Post-Bid
Less than $60,000 est. value
Mattapoisett, MA 02739

Barlows Landing Dinghy Dock Improvement
Results
$260,000 est. value
Buzzards Bay, MA

Reported 02/28/2020 12:00 AM
Project Title

Replacement of Winter Island Finger Floats

Physical Address View project details and contacts
City, State (County) Salem, MA 01970   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $40,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Two (2) Timber floats with overall dimensions of 23 feet in length and 8 feet in breadth each shall be furnished and installed to the existing float system at Winter Island located at 50 Winter Island Road, Salem, MA 01970. Framing (including spanner boards) shall be 2X10 S4S SYP #2 .60 ACQ Decking shall be 2X6 S4S SYP #1 or better .60 ACQ Perimeter Skirt shall be 2X10 S4S SYP # 1 .60 ACQ Float Gap transition shall be 2x4 S4S SYP # 1 .60 ACQ

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents