Similar Projects
Last Updated | 05/16/2023 04:32 AM |
Project Title | Ackley Lake Outlet Canal Rehabilitation Project |
Physical Address | View project details and contacts |
City, State (County) | Hobson, MT 59452 (Judith Basin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Submission Close Date 5/9/2023 5:00 PM MDT The Contract Documents consisting of Drawings and Project Manual may be viewed or obtained on-line through eMACS. Construction is anticipated to begin on or around July 10, 2023. The Project shall obtain substantial completion by September 29, 2023. The Montana DNRC will hold a Pre-Bid Conference at the project site on May 2, 2023. Those attending the conference are asked to meet at the Hobson-Philbrook Cemetery at 11:00 AM MST. From there, the Engineer will escort interested parties to the project site. The Engineer will be available to accept and answer questions related to the project until close of business on May 9, 2023. estimated value or budget $300,000.00 - $400,000.00 The project consists of the reshaping, grading, and installation of liner materials in a 2,100 lineal foot section of the Ackley Lake Outlet Canal. The Ackley Lake Outlet Canal Rehabilitation Project also includes a rip rap drop in the outlet channel (Additive Alternate 1). The work generally includes removal of excess soil and vegetation from the canal, grading and shaping the canal invert and side slopes to design elevations and grades, installation of liner materials, installation of gravel ballast material, excavation and backfill of side slope anchor trenches, installation of liner terminus anchors, installation of rip rap protection, finish grading, seeding, general site cleanup after construction, and incidentals. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |