Similar Projects
HVAC/Refrigeration Services
Term Contract
Bidding
MO

Public Health Department HVAC Controls
Alteration
Bidding
Saint Charles, MO 63301

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Virginia Avenue Housing Complex, Heat Pump Replacements
Results
$85,500 to $95,000 est. value
Columbia, MO 65201

Kitchen Hoods Inspection and Cleaning
Results
Columbia, MO 65202

Rooftop Unit Replacement for Ozarks Technical College Springfield Campus
Alteration
Bidding
Springfield, MO

Repair of East Cooling Tower for the City of Columbia Municipal Power Plant
Post-Bid
Columbia, MO 65201

Ward Edwards NOC Cooling System Replacement Project
Results
Warrensburg, MO

Rooftop Unit Replacement for Ozarks Technical College Richwood Valley Campus
Alteration
Bidding
Nixa, MO 65714

Statewide Hazardous Waste Disposal and Recycling Service
Term Contract
Post-Bid

Heating Equipment
Results
Belton, MO 64012

KCPS Franklin Elementary - Coolers
Alteration
Bidding
MO 64109

HVAC Services (City-Wide)
Term Contract, Alteration
Post-Bid
Springfield, MO

Four (4) New Fully Installed HVAC Units
Alteration
Results
Rolla, MO

Reported 09/24/2021 12:00 AM
Project Title

Harry S. Truman HVAC - Mold Mitigation

Physical Address View project details and contacts
City, State (County) Warsaw, MO   (Benton County)
Category(s) Environmental, Single Trades
Sub-Category(s) Hazardous Waste Disposal, HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work is renovation work of an existing facility consisting of ceiling tiles, lighting, wood panel walls, concrete work, flooring and other work. Mold Remediation of applying mold killer/disinfectant prior to replacing or making repairs.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents