Similar Projects
300 West 900 North to 1600 North Waterline Replacement
Infrastructure
Bidding
Spanish Fork, UT

River Bottom Improvement Project Prequalification
Post-Bid

Pressurized Irrigation Extension Project 2021
Post-Bid
Mapleton, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 2000 South Utility
Results
$2,200,000 to $2,400,000 est. value
Orem, UT 84057

Woodland Hills Waterline Replacement - Phase 2A
Infrastructure
Post-Bid
Woodland Hills, UT

200 South Water Main Improvements
Results
$3,000,000 to $3,400,000 est. value
American Fork, UT 84003

CM/GC for Cold Springs Transmission Pipeline Rehabilitation 2021
Infrastructure
Post-Bid
Spanish Fork, UT

36" Culinary Water Line Replacement Project Segment 2
Results
Less than $10,051,493 est. value
American Fork, UT 84003

2021 CDBYI Project (Community Development Building Yard Improvements)
Infrastructure
Post-Bid
Eagle Mountain, UT 84005

Mill Ditch Project
Results
Less than $1,665,895 est. value
Pleasant Grove, UT 84062

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

2020 Waterline
Results
$1,700,000 to $1,900,000 est. value
Orem, UT

36" Culinary Water Line Project Segment 3
Infrastructure
Post-Bid
American Fork, UT

2020 2000 South PRV Project
Results
Orem, UT 84058

Last Updated 02/04/2022 06:07 PM
Project Title

Vineyard City Phase 1 Water Distribution Pipeline

Physical Address View project details and contacts
City, State (County) Vineyard, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of this Contract includes the installation of 12-inch, 16-inch, 24-inch, 30-inch, and 36-inch DR-18 C-900 PVC piping, valves, and appurtenances; installation of 28-inch steel casing and 20-inch DR-11 HDPE carrier pipe by means of jacking and boring; installation of 36-inch steel casing and 28-inch DR-11 HDPE carrier pipe by means of jacking and boring; installation of 24-inch RCP; construction of a concrete headwall; crossing of UTA and UPRR railroad tracks at three locations - two by means of jacking and boring, and one through an existing concrete tunnel; water service connections; installation of new fire hydrants; removal of existing concrete vaults and their associated piping, valves, and appurtenances; and capping and abandoning existing waterlines.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents