Similar Projects
Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53711

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53711

2021 Road Overlays
Post-Bid
Sun Prairie, WI

2021 MLS/LRIP-S Road Reconstruction and Overlay
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Winnequah Road Traffic Calming
Results
Monona, WI 53716

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Ridgewood Way Overlay
Infrastructure
Post-Bid
Madison, WI 53713

2021 Chip Seal and Crack Seal Repair Program
Results
Fitchburg, WI

Safe Streets Madison 2022 - Group 2
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

HMA Pavement - State Projects
Infrastructure
Post-Bid
Madison, Roxbury, Verona, WI

Last Updated 02/03/2023 12:43 PM
Project Title

Atwood Avenue Reconstruction & Sewer Lining - City of Monona

Physical Address View project details and contacts
City, State (County) Monona, WI 53716   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $340,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. As of February 3, 2023, this project is included in the City of Monona's FY 2023-2027 Budget CIP and funding is allotted for FY 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents