Last Updated | 02/11/2023 02:02 AM |
Project Title | 2022 WWTP Upgrades - MBR Preselection |
Physical Address | View project details and contacts |
City, State (County) | Lakeside, OR 97449 (Coos County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,156,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Lakeside intends to construct the 2022 Lakeside Wastewater Treatment Plant (WWTP) Upgrades based on a MBR treatment system. The City intends to select an MBR Manufacturer of flat plate technology, Base Bid, to allow the Engineer to proceed with the design of the improvements. The selected MBR Manufacturer will agree to supply to the City or its assigns, the equipment, labor, field testing, start-up assistance, and materials specified for the Proposal/Bid price submitted. Work includes the MBR Manufacturer's on-site certification of proper installation of the MBR equipment, and training of Owner's staff in operation of the MBR system. Additive Alternate No. 1 includes the MBR manufacturer to supply a plant wide SCADA system. The equipment will be installed by a Contractor hired by the Owner under a separate Contract. The Contract between Owner and the selected MBR Manufacturer will be assigned to this Contractor. Proposals/Bids will be evaluated based on the following criteria: (1) present worth cost of the complete MBR facility; (2) process design to include calculations; (3) maintenance and service availability and guaranteed process performance; (4) operation and maintenance characteristics; and (5) MBR Manufacturer's experience and references for treatment and control systems. Refer to Instructions to Bidders and Bid Form and Proposal Outline for more details. If selected, the MBR Manufacturer shall enter into a Contract with the Owner. This Contract will obligate the MBR Manufacturer to furnish the specified equipment under the terms of the Contract for the price (Bid) in the Proposal/Bid submitted, and the highest standards prevalent in the industry. A Pre-Bid Conference will not be held. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |